Add to Cart
The fibers are put in a loose tube that is crafted from high
modulus plastic and filled with gel. Tubes (together with fillers)
are twisted around the non-metallic strength member (FRP) to
constitute the cable core. Afterward, the cable core is filled with
the cable jelly for safeguarding it against water infiltration.
Ultimately, a PE jacket is extruded.
Features
Application
Technical Parameter
Fiber Count | Outer Dia.(mm) | Tensile Resistance(N) | Crush Resistance(N/100m) | Mini Bending Radius(mm) | Attenuation (db/KM) | Operation Temperature(℃) | N.W(kg/km) | ||||
Long Term | Short Term | Long Term | Short Term | Dynamic | Static | 1310nm | 1550nm | ||||
2-36 | 10.0±0.2 | 600 | 1500 | 300 | 1000 | 20D | 10D | ≤0.36 | ≤0.22 | -40℃~+60℃ | 90 |
38-72 | 11.2±0.2 | 600 | 1500 | 300 | 1000 | 20D | 10D | ≤0.36 | ≤0.22 | -40℃~+60℃ | 90 |
96 | 11.8±0.2 | 600 | 1500 | 300 | 1000 | 20D | 10D | ≤0.36 | ≤0.22 | -40℃~+60℃ | 110 |
120 | 12.5±0.2 | 600 | 1500 | 300 | 1000 | 20D | 10D | ≤0.36 | ≤0.22 | -40℃~+60℃ | 133 |
144 | 13.8±0.2 | 600 | 1500 | 300 | 1000 | 20D | 10D | ≤0.36 | ≤0.22 | -40℃~+60℃ | 161 |
About Us
Our company is committed to serving various businesses in the
optical cable communication field, encompassing the sales of
optical fiber cables, the production of optical cables, and the
carrying out of both online and offline cooperation with
construction workers. It has offered substantial assistance and
services to communication construction personnel both domestically
and internationally, thereby obtaining the praise and
acknowledgment from individuals at home and abroad.
Our Factory
Packing
Certifications
FAQ
Q1: Do you provide OEM services?A1: Yes,we can produce by your samples or technical drawingsQ2: Can I negotiate the prices?A2: Yes, we may consider discounts formultiple container load of mixed goodsQ3: Can I visit you?A3: Sure, our factory is in Chengdu, China. Please contact us to make an appointmentQ4: How can i get your catalogue and price list?A4: Please let us know your email or contactus from website directly for our catalogue and price listQ5: How much will the shipping charges be?A5: It depends on the size of your shipment and the method of shipping. We will offer the charge to you as you requestedQ6. How about your delivery time?A6: Generally, it will take 5-7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order
Anticipate that this will serve as an excellent commencement for our collaboration!