3 Cone Oilfield Drilling Rig Parts Shale Mud Cleaner Shaker

Brand Name:Pangolin
Delivery Time:5-15work days
Payment Terms:T/T
Place of Origin:Hebei China
Price:Negotiable
Packaging Details:According to customer needs
Contact Now

Add to Cart

Verified Supplier
Location: Langfang Hebei China
Address: HeBei,China
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

HDD Mud Recycling System With Modular Design And Small Footprint

Usage and Applicability


Drilling fluid shale shaker is the primary solids control equipment in the drilling fluid solids control system.

The shale shaker sreens the drilling fluid with great amount cuttings,separates the large-size solid particles ,and sent the drilling fluid to the next seperating equipments.

the Shale Shaker has the advantages of simple structure,reliable performance,large disposal capacity,long service life,and simple maintenance.



Product parameters


ModelCSJ-FN-30CCSJ-FN-60CCSJ-FN-120CCSJ-FN-200C
Capacity (m3/h)3060120200
Slurry pumpModelDC-EHM-1.5CDC-EHM-3CDC-EHM-3CDC-EHM-4C
Power (Kw)7.5112237
Pressure (MPa)1.0~2.0
Shale shakerPower(Kw)1.5233
Vibration force(KN)30406060

Screen
size (mm)

UP1400X6001700x7001900X10002100x1200
Down1400X6001700x7001900X10002100x1200
Cone ModelFN-100FN-150
Cone Number36128
Separation size (μm)10-30
Total Power (KW)9132540
System Max.Size(mm)1650X1450X21502000X1600X22502170X2000X24002400*2300*2400
System weight (Kg)1200190025003500


HDD Mud Recycling System Working Procedure


1. There is a drill pit at each side of drilling hole, a set of vertical slurry pump will set on top of mud pit for feeding shale shaker. The shale shaker screen will separate drilling cuttings and discharge out, fluids part will drop into sand trap through screen hole.
2. 1 or 2 or 3 sets of desander cyclone sit after shale shaker, one set of centrifugal pump will feed desander cyclong for second phase separation, solids out of desander will be discharge to shaker screen or cutting box directly and fluids over flow from desander will flow into desander compartment.
3. A quantity of desilter cyclones will sit after desander for fine solids separation, solids out of desilter will discharge to shaker screen or cuttings box, fluids over from desilter will drop into desilter compartment.
4. A mixing pump sit on tank skid for drilling mud transfer and feed mud into mud hopper for new mud remix by new chemicals. The mixing hopper can sit on top of tank or tank skid as per client’s demand.


Structure and Operating Principle


The shale shaker is composed of feeding tank,base,screening box,and vibrating motor etc.six isolation springs sustain the screening box on the base.three same or different mesh screens are installed on the screening box working surface.

Having absorbed the latest achievements in screening machine at home and abroad and integrated the strong points of circle and rectilinear vibration, the shale shaker greatly raises the speed of carrying drill cuttings and boost through–screen quantity of drilling liquid, thus avoiding pasting on the screen. The shale shaker takes double explosion-proof vibration motors as vibrating source, and forms rectilinear movement by the action of reversal rotation vibration motors. It is especially applicable in the working conditions with stratigraphic fluctuation. Its advantages become more apparent as drilling liquid is of much higher viscosity.



Pic Show




FAQ:

1. How to order the products?
A: Please send the inquiry with detail item description or with Model number.

2. Can I expect a quality products?
A: Yes. mature production technology ensuring the quality satisfy international request.

3. How about the regular packing?
A: If there is no special packing requirement, we will take it as regular packing. First put them in small cartons, then put large cartons together to make sure the goods are finished.

4. How to check if the product is what you want?
A: If possible, please attach a reference picture so as not to cause any misunderstanding or any links on our website for better understanding.

5. How to control quality?
A: We have our own experienced QC team,there will be strict inspection and testing for each order before shipping out.

6. Fast delivery time:
A: Usually it takes 25 days for production.only 3 or 5 days if we have stock of your request size.

7. Competitive price:
A: Our factory can supply you the lowest price due to direct sale to customers without distributor!

China 3 Cone Oilfield Drilling Rig Parts Shale Mud Cleaner Shaker supplier

3 Cone Oilfield Drilling Rig Parts Shale Mud Cleaner Shaker

Inquiry Cart 0