Floor Truss Steel Metal Roofing Roll Forming Machines For Purlin

Brand Name:TGMCO
Certification:SGS
Minimum Order Quantity:1 set
Delivery Time:5 sets per month
Payment Terms:L/C, T/T
Place of Origin:Jiangsu, China
Contact Now

Add to Cart

Verified Supplier
Address: No.8, Biyun Rd, Fuqiao Town, Taicang City, Jiangsu Province, China
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

Metal Decking Floor Sheet Roll Forming Making Machine


1) Speed of product line: maximal speed: 6-7/min (approx 2880-3360 m2 per day) (frequency conversion to adjust speed)

2) The dimension the product line: about 120 mX18mX3.5m

3) Total power of the product line: about 400 KW(Include the electricity heating 200kw)

4) Single shift can produce 820,000-960,000 m2 (the line can operate 24 hours per day)

5) 2 component Chinese PU foaming machine

6) The final panel width:1000mm

7) The thickness of the steel sheet:0.3-0.7mm

8) Core materials: PU

9) Density of the PU panel: 40-45kg/m3.

10) The length of the double belt: 24m


Machine components


No.NameQty
15T Manual Uncoiler1
2Leveling1
3Roll Forming Machine1
4Tracking Hydraulic Cutting1
5PLC Control Box1
6Hydraulic Pump Station1
9Output Table2


Technical parameters

ItemsItemsSpecifications
Material of coilMaterial Width900-1250mm
Material Thickness0.5-1.0mm
Manual Uncoiler5 tons
Leveling5rollers2rollers up, 3rollers down
Forming systemForming Speed5-15m/min
Forming Stationsabout 22-26 stations
Roller MaterialGCr15
Shaft diameter75mm
Shaft Material45#steel
Main Motor Power22kw
Machine structureWall board and chain drive
TransmissionChain drive, 1inch, double chain
Cutting systemHydraulic Power3kw
Cutting bladeCr12Mov,quenching HRC 58-62
Tolerance+-1.5mm
Electrical control systemElectric Source380V, 50HZ,3 phase
PLC Control SystemSiemens/Panasonic

Profile drawing


Working flow


Decoiler—Feeding&LevelingRoll forming—Cutting—Output table


Picture for reference



.

FAQ
1) Q: Will you deliver the right goods as ordered? How can I trust you?
A: Yes, we will. We are Gold supplier of Made-in-China with SGS assessment (Audit report can be provided). We have cooperated with many customers all over the world with high market reputation, no worries.
2) Q: How to choose the Tube Mill Line?
A: You have to inform us following details:
- The pipe material
- Round pipe range
- Square pipe range
- Rectangle pipe range
- Wall thickness range
- The pipe usage
3) Q: How to choose the Roll Forming Machine?
A: You have to inform us following details:
- Coil material
- Coil thickness
- Coil weight
- Cutting type
- Profiles drawings
- Other special attention
4) Q: How to choose the Slitting Line & Cut to Length line?
A: You have to inform us following details:
- Coil material
- Coil thickness
- Coil width
- Coil weight
- Finished sizes
- Other special attention
55) Q: Where is the nearest airport to your company?
A: Shanghai Putong or Hongqiao Airport.
6) Q: How about your service?
A: Before sales:
- Technical Support: TGMCO will provide detailed technical information such as technical & commercial offer, machine photos, running video, layout, operation manual, and show you working machines in our factory.
- Apply Visa: TGMCO will provide officially invitation letter to apply Visa in china embassy as authority procedures and requirements.
After sales: TGMCO provides comprehensive After Sales Support and Service to meet our customer need.
- Drawings: Provide the foundation drawing, electric scheme and wiring diagram, hydraulic drawing, pneumatic & electric pipeline drawing and other drawings requested by customer.
- Installation and commissioning: TGMCO will send our technicians to customer's workshop for supervision of installation and commission
Training of Customers' technician/workers during commission
- Breakdown Support: We offer 1 year warranty service for main crucial components except consumables
Inform immediate technical assistance and advice to customer by phone or e-mail.
Skilled and experienced engineers are capable of dealing with any type of breakdowns.
Technical service work performed in Customer's site if required.
Urgently supply mechanical or electronic components.
Fast supply of spare parts and wearing parts to cover foreseeable requirements


Packing & Delivery


China Floor Truss Steel Metal Roofing Roll Forming Machines For Purlin supplier

Floor Truss Steel Metal Roofing Roll Forming Machines For Purlin

Inquiry Cart 0