Add to Cart
1) PURCHASE RAW MATERIALS;
2) CUSTOM FIXTURE AND MACHINE ADJUSTMENT;
3) COMMUNICATE WITH OUR ENGINEERS ABOUT THE COST COMPOSITION OF PRODUCTION PARTS.THIS ALLOW YOU TO BETTER UNDERSTAND THE COST COMPONENTS OF THIS QUOTATION.
4) ACCORDING TO YOUR PRODUCTS. WHILE ENSURING THE PRODUCT QUALITY,WE WILL CHOOSE THE MOST SUITABLE LATHE FOR YOU TO PROCESS.HELP YOU SAVE COST AND TIME.
5) SURFACE TREATMENT.IF YOU HAVE REQUIREMENTS FOR SURFACE TREATMENT OF PRODUCTS.WE CAN DO ALSO PROCESS THEM.
6) SPOT CHECK AND FINAL PACKAGING.
Q1:Where can I get product&price information?
A1:Send us inquiry e-mail , we will contact you as we receive your
mail.
Q2:How long can I get the sample?
A2:Depends on your specific items,within 3-7 days is required
generally.
Q3:What's kinds of information you need for quote?
A3:Kindly please provide the product drawing in PDF,and will be
better you can provde in STEP or IGS
Q4: what's the payment term?
A4: We accept 50% as payment deposit, when the goods is done, we
take photoes for your check and you then pay the balance.For small
amount, we accept Paypal, Paypal commission will be added to the
order. For big amount, T/T is preferred
Q5: How to delivery the goods?
A5:We deliver the products by courier company
Q6.Are you a trading company or factory?
A6:We are direct factory with 12 experienced engineers and more
than 260 employees as well approximate 9,000 square meters workshop
area.
Q7. What shall we do if we do not have drawings?
A7:Please send your sample to our factory,then we can copy or
provide you better solutions. Please send us pictures or drafts
with dimensions(Length,Hight,Width),CAD or 3D file will be made for
you if placed order.
Q8. Can we get some samples before mass production?
A8:Absolutely
1. Analysis and confirm design artwork;
2. Arrange purchasing raw material;
3. Engineer write CNC program;
4. Make the trial sample for checking details;
5. Mass Production;
6. CNC parts quality inspection;
7. Surface Treatment;
8. Surface finished checking;
9. Packaging;
Factory Environment: