Home /General Industrial Equipment Stock /

Heating and bathing Dual function Home Use Gas Wall Hung Boiler 32kw Gas or PLG Combi Boiler

Heating and bathing Dual function Home Use Gas Wall Hung Boiler 32kw Gas or PLG Combi Boiler

Brand Name:RENO
Certification:ISO14001,OHSAS18001,ISO9001,3C
Model Number:LLGB32GK
Minimum Order Quantity:Negotiable
Delivery Time:30days after receiving the deposit
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: NO.7 LONGRUI ROAD BEIGUAN INDUSTRIAL PARK JIAOBEI STREET OFFICE JIAOZHOU QINGDAO CITY SHANDONG PROVINCE
Supplier`s last login times: within 31 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Heating and bathing Dual function Home Use Gas Wall Hung Boiler 32kw Gas or PLG Combi Boiler

The role of the main board: It is used to control the start and stop of the HVAC equipment, and constant temperature of the system.

The function of the gas valve is to ensure the normal combustion of the boiler. In a certain range of gas pressure, make the boiler stable combustion and can automatically adjust the gas supply according to the requirements of the boiler heat output, in order to realize the automatic shutdown of the boiler and gas proportion regulation.

The function of water flow switch: detect the amount of tap water through, under certain conditions, make the boiler switch to domestic hot water mode.

The role of the air pressure switch: The air pressure switch is mainly responsible for the safety protection in the wall mounted furnace system. It is divided into two chambers by a valve inside, and the two chambers on both sides of the valve are respectively connected with two pressure measuring tubes. By comparing the pressure obtained by the pressure measuring tube, it can detect whether the smoke exhaust system is normal.

The role of water pressure switch: In order to ensure the normal operation of the heating system, the system is filled with water, and maintain a certain pressure. The water shortage protection can be achieved by detecting the system pressure through the water pressure switch.

GAS WALL HANGING BOILER INSTRUCTIONS

1. Safe and Reliable
With 21 kinds of safe protectionLow failure rate

2. Comfort
Ultra-quiet operationmore comfortable

3. Convenience
Touch controlmore precise

4. Environmental protection
Eenrgy saving and environmental protectionFollow the trend

5. After sale
7*24 after-sales service,worry free


TECHNICAL DATA OF GAS WALL HANGING BOILER

MODELLLGBQ32-GK

SPECIFICATIONS

Q32-GK

RATED INPUT POWER(KW)

32kw

RATED OUTPUT POWER(KW)

34.5kw

THERMAL EFFICIENCY(%)

≥108%

RATED VOLTAGE FREQUENCY(V/Hz/W)

220/50/120

GAS TYPE

NG/LPG

GAS PRESSURE(Pa)

2000/2800

TEMP.RANGE OF HEATING WATER(℃)

DHW:30-60 HEATING HOT WATER:30-80

△T=25℃ HOT WATER SUPPLY(KG/MIN)

13.6

APPLICATIVE WATER PRESSURE(MPA)

0.05-0.6
DIMENSION(HIGH*WIDE*THICK)740*460*325
WEIGHT(KG)45
DIAMETER OF SMOKE PIPEφ(COAXIAL)φ60/100






















PRODUCT DISPLAY

The system connection and water injection connection are performed in the following steps
1, loosen the pump automatic exhaust valve and the system body heating water distributor or radiator exhaust valve.
2. Open the water refill valve and system water supply valve of gas heating hot water furnace and close the water outlet valve of sanitary hot water.
3. When the pressure of the heating system reaches 0.1MPa (the pressure gauge shows 1.0bar), close the water refill valve of the gas heating hot water furnace.
4, In order to discharge the air in the pump as soon as possible, you can start the circulating water pump repeatedly. There is air in the system , which will cause noise and affect the normal operation of the system. Close the exhaust valve of the water system when it has discharged water.


When the wall mounted furnace starts, after the system pressure is normal, the water pump starts to promote the heating media water flow, turn on the water flow switch or water flow sensor, output water flow signal (switch signal or pulse signal) to the main controller, the main controller receives the water flow signal, start the fan to clean before, and detect whether various safety devices are normal, in the case of normal safety devices, Ignition, and then respectively open the first and second valves, gas into the burner under the action of electric spark ignition gas combustion (in the process of ignition, the fan is generally half speed operation or power by inertia operation, to be burning, according to the amount of gas to determine the fan speed. For the use of gas proportional valve models, proportional valve ignition current, minimum current, maximum current, and respectively can be adjusted), through the ion flame technology to make the flame normal combustion, heating media through the radiator to the air or radiation out, to achieve the purpose of heating. And so on.


The system connection and water injection connection are performed in the following steps

1, loosen the pump automatic exhaust valve and the system body heating water distributor or radiator exhaust valve.

2. Open the water refill valve and system water supply valve of gas heating hot water furnace and close the water outlet valve of sanitary hot water.

3. When the pressure of the heating system reaches 0.1MPa (the pressure gauge shows 1.0bar), close the water refill valve of the gas heating hot water furnace.

4, In order to discharge the air in the pump as soon as possible, you can start the circulating water pump repeatedly. There is air in the system , which will cause noise and affect the normal operation of the system. Close the exhaust valve of the water system when it has discharged water.

The water way of circulating hot water is: circulating water pump → main heat exchanger → hot water inlet at three-way valve → hot water circulation outlet at three-way valve → plate heat exchanger → circulating water pump.

ABOUT US
Qingdao Hiounce hvac equipment co., Ltd., located in "brand, the beautiful coastal city - qingdao, China, was founded in the 1950s of the qingdao municipal restructuring state-owned enterprises - qingdao boiler factory. it is a company dedicated to research and development, production of high-grade wall hanging furnace, the electric heating furnace, biomass heating boiler, kitchen burning gas, discharge of oil absorption and the module of boiler fuel gas high-tech enterprises.

Qingdao Hiounce hvac equipment co., Ltd.have more than 100 employees.Company headquarters has total handling, personnel department, finance department, marketing department, the ministry of commerce, office (provincial), purchasing, and import and export department, technology department, engineering department, after-sales service department, and other functions of the eleven departments, through the perfect sales and service network, security, stability, energy saving, environmental protection products supply users.

China Heating and bathing Dual function  Home Use Gas Wall Hung Boiler  32kw Gas or PLG Combi Boiler supplier

Heating and bathing Dual function Home Use Gas Wall Hung Boiler 32kw Gas or PLG Combi Boiler

Inquiry Cart 0