200T / Month Oxidation production line withRemote monitoring and control

一. Production Description:

1.Anodizing production lines are designed with environmental considerations in mind.

2.As production needs grow, mini anodizing production lines can often be expanded with additional automation modules.

3.A mini anodizing production line can be integrated into a larger manufacturing process or assembly line.

二.Process Tank

1Degreasing 【Free sulfuric acid 180±30 g/l】1 Tank
2Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】1 Tank
3NeutralizationFree sulfuric acid180±20g/l】1 Tank
4Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】1Tank
5Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】1 Tank
6Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】1 Tank

.Design Condition

1AlloyAluminium 6061 to 6063 or others
2Anodizing film thinkness10~ 12µm micron
3Average coverage area350m²/T (ton)
4Max aluminium profile length6500mm
5Extrusion ratio2.5kg/m²
6Working hour/m300d/m x 20h/d = 600h/m
7Racking systemTwo fixtures /rack
8Racking operationManual
9

Equipment Usage Rate


0.9
10Power supplyAC 3phase 380v 50hz
11Control PowerAC220V 50Hz
12Water supply2kg/cm²·G
13Hot steam6kg/cm²·G
14Compressor air6kg/cm²·G

四.Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 2 jig(rack)/tank x 1tanks = 2jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min

(6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity:2 jig(rack)/tank x 1tanks = 2jig(rack)

3) Current density: 70A

4) Process time: 2-8min


6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2)
Quantity:6jig(rack)/tank x 1 tank
3) Process time 10-15min


五.Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:

( 2 rack x 1 tank x 60min/h) ÷40min x600 hour =1800jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3)
Area treatment/year : 1800jig(rack)x 50m² /jig =90000m²


2. Anodizing treatment weight:
Monthly output : 90000m²÷350m²/T*0.9=231T≧200T


3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =1unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =1 unit


六.Process Chat


Discription for Un
1DeDegreasing
2RsRinsing
3HW RsHot Water Rinsing
4AEAlkaline Etching
5NeNeutralization
6AnAnodizing
7ClColoring
8SlSealing
9MUMaterial Unloading
10PcPacking


China 200T / Month Oxidation Production Line With Remote Monitoring And Control supplier

200T / Month Oxidation Production Line With Remote Monitoring And Control

Inquiry Cart 0