Product Details

2000T/month Minimal waste generation Anodizing Production Line


一. Production Description:

1.Anodizing production lines often include pre-treatment processes to prepare parts for anodizing.

2.Anodizing production lines can offer a range of color options for anodized coatings.

3.Anodizing production lines incorporate mechanisms for controlling the thickness of the anodized coatings.

二. Design Condition:

1AlloyAluminium 6061 to 6063 or others
2Anodizing film thinknessThe desired anodizing film thickness is 10-12µm (microns)
3Average coverage areaThe average coverage area is 350m² per ton of aluminum profiles
4Maximum aluminum profile length6500mm
5Extrusion ratio2.5kg/m²
6Working hour/m300d/m x 20h/d = 600h/m
7Racking systemThree fixtures /rack
8Racking operationManual
9Equipment Usage Rate0.9
10Power supplyAC 3phase 380v 50hz
11Control PowerAC220V 50Hz
12Water supply2kg/cm²·G
13Hot steam6kg/cm²·G
14Compressor air6kg/cm²·G

三. Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 3 jig(rack)/tank x 6tanks = 18jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 30min
    (4) Unprocess time: 10min
    (5) Total time 30+10=40min

(6) Average anodizing layer : 0.36*1.3*30*0.77 =10.81um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

3) Current density: 70A

4) Process time: 2-8min


6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2)
Quantity: 6jig(rack)/tank x 1 tank
3) Process time 10-15min

四.Process Tank

  1. Degreasing 【Free sulfuric acid 180±30 g/l】 1 Tank
  2. Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】 2 Tanks
  3. NeutralizationFree sulfuric acid180±20g/l】 1 Tank
  4. Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】 6 Tanks
  5. Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】 3 Tanks
  6. Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】 3 Tank

五. Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 40min ,where total jig(rack)/year:

( 3 rack x 6 tank x 60min/h) ÷40min x600 hour =16200jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3)
Area treatment/year : 16200jig(rack)x 50m² /jig =810000m²


2. Anodizing treatment weight:
Monthly output : 810000m²÷350m²/T*0.9=2082T≧2000T


3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =6unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =3 unit


六. Process Chat

Discription for Un
1DeDegreasing
2RsRinsing
3HW RsHot Water Rinsing
4AEAlkaline Etching
5NeNeutralization
6AnAnodizing
7ClColoring
8SlSealing
9MUMaterial Unloading
10PcPacking


China 2000T/month Minimal Waste Generation Anodizing Production  Line supplier

2000T/month Minimal Waste Generation Anodizing Production Line

Inquiry Cart 0