950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500

Brand Name:MEI-AL
Model Number:APL-950T
Minimum Order Quantity:1set
Delivery Time:180-200days
Payment Terms:T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Foshan China
Address: No. 1, Changgang North Road, Changhongling Industrial Park, Shishan Town, Nanhai City, Foshan City
Supplier`s last login times: within 38 hours
Product Details Company Profile
Product Details

950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500


一. Equipment Name

1NameControl Horizontal Anodiding line
2Output950T/Month
3ModelHorizontal U mode
4Operation styleSemiautomatic or Automatic
5Racking methodManual racking system

二. Design Condition

1AlloyAluminium 6061 to 6063 or others
2Anodizing film thinkness10~ 12µm micron
3Average coverage area400m²/T (ton)
4Max aluminium profile length6500mm
5Extrusion ratio2.5kg/m²
6Working hour/m300d/m x 20h/d = 600h/m
7Racking systemThree fixtures /rack
8Racking operationManual
9Equipment Usage Rate0.9
10Power supplyAC 3phase 380v 50hz
11Control PowerAC220V 50Hz
12Water supply2kg/cm²·G
13Hot steam6kg/cm²·G
14Compressor air6kg/cm²·G

三. Process Tank

1Degreasing 【Free sulfuric acid 180±30 g/l】1 Tank
2Alkaline Etching【Free alkali 40-60g/l,Al3+ 30-120g/】2 Tanks
3NeutralizationFree sulfuric acid180±20g/l】1 Tank
4Anodising 【Free sulfuric acid 140-180g/l,Al3+≤20g/l】3Tanks
5Colouring 【stannous sulfate 3-8g/l,Free sulfuric acid 15-25g/l,PH 0.8-1.2】1 Tank
6Medium Temperature Sealing【PH 5-6.5,Nickel ion0.8-1.3g/l,Fluorion0.3-0.7 g/l】1 Tank

四.Treatment Process:

  1. Degreasing
    (1) 6jig(rack)/ tank x 1 tank
    =6jig(rack)
    (2) treatment time: 2-5min
  2. Alkaline Etching
    (1) 6jig(rack) / tank x 2 tank
    =12jig(rack)
    (2) treatment time: 3-15min
  3. Neutralization
    (1) 6jig(rack) / tank x 1 tank
    =6jig(rack)
    (2) treatment time: 1-5min
  4. Anodizing
    (1) 3 jig(rack)/tank x 3tanks = 9jig(rack)
    (2) Current density: 130A/m²
    (3) Process time: 28min
    (4) Unprocess time: 10min
    (5) Total time 28+10=38min

(6) Average anodizing layer : 0.36*1.3*28*0.77 =10.1um

  1. Colour 1

1) Clour process: Mix Salts

2) Quantity:3 jig(rack)/tank x 1tanks = 3jig(rack)

3) Current density: 70A

4) Process time: 2-8min


6. Sealing
1) Sealing menthod: Sealing at Medium or Normal Temperature
2)
Quantity:6jig(rack)/tank x 1 tank
3) Process time 10-15min


五. Design Parameter and Setting

1. Anodizing treatment area:
1) Each anodizing process tank need 38min ,where total jig(rack)/year:

( 3 rack x 3 tank x 60min/h) ÷38min x600 hour =8526jig(rack)

2) Design 50m²/jig(rack) . Where every tank is 100m²
3) Area treatment/year :
8526jig(rack)x 50m² /jig =426300m²


2. Anodizing treatment weight:
Monthly output : 426300m²÷400m²/T*0.9=959T≧950T


3. Power consumption:
1) Anodising Tank:100m²/tank* 130A/ m²÷0.9=14444A/tank

Power Rectifier : 15000A =3unit
2) Clouring tank: 100㎡/tank×70A/m²÷0.9 = 7777A/tank

Colour Rectifier : 8000A =1 unit


六. Process Chat


Discription for Un
1DeDegreasing
2RsRinsing,
3HW RsHot Water Rinsing
4AEAlkaline Etching
5NeNeutralization
6AnAnodizing
7ClColoring
8SlSealing
9MUMaterial Unloading
10PcPacking


China 950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500 supplier

950T/Month Manual Horizontal oxidation Line Equipment 8000*width*3500

Inquiry Cart 0