Product Details
OEM Custom Stainless Steel Precision Sheet Metal Fabrication Parts
Stamping
Sheet Metal Fabrication:
- Design: The process begins with the design of the sheet metal part using
CAD (Computer-Aided Design) software. The designer creates a 2D or
3D model of the part.
- Material Selection: Choose the appropriate sheet metal material based on factors like
strength, corrosion resistance, and cost.
- Material Cutting: The selected sheet metal is cut to the required size and shape
using various methods like shearing, laser cutting, or plasma
cutting.
- Blanking: This involves cutting out the basic shape of the part from the
sheet metal.
- Forming: Forming operations, such as bending, stamping, or deep drawing,
are performed to shape the metal into the desired form.
- Assembly: If the part consists of multiple components, they are assembled
together. This may involve welding, riveting, or fastening.
- Finishing: Surface treatments like painting, powder coating, or plating can
be applied to improve aesthetics and protect against corrosion.
- Quality Control: The finished part is inspected to ensure it meets the required
specifications and quality standards.
Brand | Chenyang |
Our products | High-speed rail/ bullet train/ subway spare parts, Fitness/ massage
equipment spare parts, Wind power accessories, Automobile /
motorcycle spare parts, Solar street light spare parts,
Telecommunication and security equipment spare parts, Water filter
accessores, Plastic air filter spare parts, Fire Accessories etc,
such as Sheet plate series, Cabinet Series,Die casting series, CNC
machining series,Injection plastic series etc |
Place of Origin |
|
Size | OEM Standard Size |
Surface | Matte or gloss or according to clent's requirement |
Process | die casting Cnc maching |
Available Materials | AL:5052/5754/5082/5083/6061/6063/6082…. ZL101/ZL102/ADC12… Carbon Steel: Q235B/Q345E/Q345D/SPCC/SECC/DX51D/DX53D… Stainless steel: 304/316/430/201... |
Payment | T/T, L/C, Money Gram, Western Union |
Delivery | Sample: 3~5 days for no mould items and 7~10 days for mould items Mass goods: 15~20 working days |
Company Profile
Qingdao Chenyang Machinery MFG Co., Ltd. was established in May
2007, is a set of sheet metal, machining, die casting, spraying and
injection molding integrated production of high-tech enterprises.
The headquarters of the company is located in Yunshui 2nd Road of
the Automobile Industry New Town, with a construction area of
45,000 square meters, and the branch plant is located in Qingdao
Environmental Protection Industrial Park, with a construction area
of 12,000 square meters. The company has more than 200 employees,
including 45 management personnel and 27 middle and senior
technical R&D personnel. The company consists of sheet metal,
CNC processing department, die casting, injection molding four
industries, including sheet metal laser, bending, welding,
riveting, powder coating, painting, assembly and other departments.

