Product Details
High quality 90w 100w ip65 heavy duty led solar street light with pole
| | |
| | |
| | |
| | |
| |
| |
| |
| |
| |
| |
| |
| Light Control + Remote Control + Time Control |
| Street Lighting / Courtyard Lighting / Park Lighting |
| |
Q1. MOQ and delivery time ?
A: NO MOQ required, sample testing welcome.. Mixed samples are acceptable.
Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q2. What about the lead time?
A: Firstly,let us know your requirements or application.
Secondly,We quote according to your requirements or our suggestions.
Thirdly,customer confirms the samples and places deposit for formal order.
Fourthly,We arrange the production.
Q3. Can you do OEM?
A: Yes, we are 18 years factory,we have design team, engineer team, after-service team QC team etc.
Q4. How about the shipping method ?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5. Do you offer guarantee for the products?
A: Yes, we offer 2-5 years warranty to our products.
Q6. How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For defective batch products, we
will repair them and resend them to you or we can discuss the solution including re-call according to realsituation.
Company Profile
Guangzhou pmd technology co ltd is dedicated in renewable energy system integration and distribution. We're the energy storage
industry's partner-of-choice for flexible, robust, reliable, and
innovative solutions guaranteed to deliver the lowest cost of
ownership. Through a continuous focus of engineered simplicity,
Enershare's battery and storage solutions optimize for efficient
installation,compatibility and high reliability.
Enershare is headquartered in Shenzhen,we have been focusing on
reliable and customized lithium battery modules, battery systems,
large scale integrated energy storage systems for years , with a
track record of 500Mwh in last three years.We have registered JV
companies in UK and Bulgaria to make sure best cost,fast delivery
and good service. Anywhere needs energy, Enershare right here!


