

Add to Cart
Pcb handling equipment automatic pcb loader machine smt magazine loader 1-4 Step pitches pcb loader unloader
Product introduction:
1.This unit is used to send PCBs out from magazine to SMT production line .
2.Stable and reliable PLC control system;
3.Optional Fuji buttons interface or touch panel interface,
convenient man-machine interaction.
4.Multiple sound and light alarming functions
5.Use standard magazines, good compatibility, load with 3 magazines
at one time.
6.Lifting distance adjustable according to PCB, 4 kinds of
distance(10mm, 20mm, 30mm and 40mm)
7.Loader configured with inner push board component, save the cost
of buying PCB moving machine independently.
8.Automatic counting function make it easy of production statistic
9.Optional SMEMA port for communication between machines.
Technical parameters | |
Function | This unit is used to send PCBs out from magazine to SMT production line |
PCB thickness | Min0.6mm |
Magazine number | Transport up:1pcs,transport down:1ps,(or customized) |
Step pitches select | 1-4(10mm step pitches) |
PCB loading time | Approx 6 seconds |
Magazine change-over time | Approx 30 seconds |
Transport direction | Left to right/right to left(optional) |
Transport height | 900±20mm(or customized) |
Air pressure | 4-6 bar, MAX10L/minute |
Power supply | 100-230V AC(customized) single phase, MAX 300V/A |
Specifications | ||||
Model No | HR-250 | HR-330 | HR-390 | HR-460 |
PCB size (L×W)~(L×W)mm | (50x50)~(350x250) | (50x50)~(455x330) | (50x50)~(530x390) | (50x50)~(530x460) |
Machine size (L×W×H)mm | 1370×750×1200 | 1550×830×1200 | 1750×920×1200 | 1750×990×1200 |
Magazine size (L×W×H)mm | 355×320×563 | 460×400×563 | 535×460×570 | 535×530×570 |
Weight | 110kg | 135kg | 155kg | 175kg |
Who We Are ?
Shenzhen Honreal Technology Co.,Ltdis a national high-tech
enterprise,Specializing in smt equipment research and development,
production, sales. Services for the world´s top 500 electronic
companies.The registered capital of the company is 5
million.Havingexperienced technical team andexcellent technical
innovation ability, Creating a better product supply chain and
service team and meeting different customer needs is our long-term
goal. We will meet customer needs by understanding customers,
putting them first and providing valuable services.
Services and commitments
Before buying the product, we will be a comprehensive analysis of
the views and requirements and recommend it to the actual needs of
customers with the most suitable products and let customers know
that the performance characteristics of the selected product
referred to in accordance with customers.
In purchasing the products, we promise to allow customers to
clearly know the completion of the product. In strict accordance
with the relevant provisions of the contract terms of production,
delivery, to ensure product intact and in place within the
stipulated time to customer requirements.
The company promises:
We highly value your feedback on the quality of information, all
the information will be given to the quality of feedback responses;
In accordance with the contract requirements for the installation,
commissioning and training of technical personnel for the buyer
sold the equipment.
We provide long-term technical support, Our company has adequate
supply of consumable buyer if requested to order spare parts, our
company can provide timely.
Certification
Packing
FAQ
Q:How can you guarantee your sales’ quality?
A:We guarantees that every set of machines are under rigorous
testing before they are delivered to you, to ensure the excellent
performance of all products.
Q:How is the training?
A:After buying our machines, your engineers can go to our company or it is so easy to operate
the machine according the training video and user manual,the user manual will come with the machine together.
Q: I would like to ask you if it's possible to have my logo on the
product.
We hope you know that our company perfectly support customized logo
service,we’re do this. Besides, it's totally free,so just tell us
your requirements.
Q: Is it hard to use these machines?
A: No, not hard at all. For our previous clients, at most 2 days is enough to learn to operate the machines.