Home /Metal & Metallurgy Machinery /

Aluminum Alloy Thermoplastic Preheater Boiler Volume 1000kg / 1500kg

Aluminum Alloy Thermoplastic Preheater Boiler Volume 1000kg / 1500kg

Brand Name:WAGE
Certification:EMS, OHSMS
Model Number:HG-Y1000 or HG-Y1500
Minimum Order Quantity:1 set
Delivery Time:1 to 3 weeks
Payment Terms:L/C, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Address: Room 401, Unit 2, Biulding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

2 tanks diesel Thermoplastic Preherater For Pavement Marking Or Repairing

Double Tanks Truck-Mounted Diesel Thermoplastic Paint Preheater / boiler for road marking

General discription

Thermoplastic applicator is one of the main equipment for the construction of thermoplastic road line marking. the powder thermoplastic paint is heated and stirred inside thermoplastic applicator to become liquid, and then the liquid paint put into the marking machine for marking construction purpose. The melting level of paint is directly related to the road line marking quality, so the thermoplastic applicator is the key component of the thermoplastic line marking equipment and an indispensable part of the paint melting. The thermoplastic applicator is usually suitable for various thermoplastic marking projects such as parking lot, urban road surface and national and provincial road surface.



WAGE thermoplastic applicator has the following functional characteristics:

1. Stainless steel cylinder block and alloy high-carbon steel pot bottom are adopted. Thermal insulation material is installed between inner liner and outer cover plate of the kettle.

2. thermoplastic kettle with two cylinders running independently can heat two kinds of paints at the same time. Vertical paddle mixer ensures more uniform melting of paints.

3. Specially designed overload overflow device/overload automatic protection device to ensure construction safety;

4. Fuel-fired and gas-fired heating systems can choose combustion modes which are beneficial to construction according to the external climate conditions and needs, so as to make fuel addition more flexible and economical. For example, fuel-fired heating systems are not easily affected by wind, and the melting materials are faster and more efficient, and can adapt to various construction environments such as strong wind and high altitude.



Perameters for all type you can choose


Parameter


Model

HG-800HG-Q1000HG-Q1500HG-Y1000HG-Y1500HG-1000HG-1500HG-600HG-300
Equipment typeHydraulic Double cylinder( GAS type)

Hydraulic Double cylinder

(Diesel type)

Hydraulic Double cylinder

(Gas and Diesel type)

Mechanical(gas type)
Heating systemDirect Injection Gas Furnace, Plum-shaped Spark HeadCyclone Fuel FurnaceCyclone Furnace for Fuel and Gas Dual UseDirect Injection Gas Furnace, Plum-shaped Spark Head
Diesel motor

15PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

16.5PS

Electric starter water-cooled type

8.0PS

water-cooled type

6.5PS

water-cooled type

Hydraulic pump pressurePressure Max 20MpaPressure Max 20MpaPressure Max 20MpaPressure Max 20MpaPressure Max 20MpaPressure Max 20MpaPressure Max 20Mpa//

Hydraulic pump

Rotation rate

(r/min)

2500250025002500250025002500//
Cylinder capacity400kg*2500kg*2750kg*2500kg*2750kg*2500kg*2750kg*2300kg*2300kg*1
Hydraulic fluid tank capacity80L80L80L80L80Lx280L80L//
Diesel tank capacity///40L40L40L40L//
Gas pipe connector222//2221

size(mm)

(L*W*H)

1800*1500*16001900*1700*17001800*1900*18001900*1750*18001900*1750*18001900*1750*18001900*1750*18001320*1350*14501320*750*1450
Weight850kg1000kg1200kg1100kg1250kg1100kg1250kg480kg320kg
Construction
Contact:
Rita QU

Xi'an Wage Traffic Infrastructure Installation Co.,LTD
Mail: wagetraffic@hotmail.com Cell/ Whatsapp: +86 15591818803
Add:Room 401, Unit 2, Bilding 2, Shenglong Plaza, Weiyang Road, Xi'an, 710016, Shaanxi, China
China Aluminum Alloy Thermoplastic Preheater Boiler Volume 1000kg / 1500kg supplier

Aluminum Alloy Thermoplastic Preheater Boiler Volume 1000kg / 1500kg

Inquiry Cart 0