

Add to Cart
Product Descri
Hitachi Excavator Swing Motor: | ZX470LC-5G, ZX200-1, ZAX450-3, ZAX230, EX200-5, EX300-2, EX300-3, EX300-3C etc |
Kobelco Excavator Swing Motor: | SK210DLC-8, SK210-8, SK210LC-8, SK120-2, SK100, SK120-3, SK460-8, SK45SR, SK330-6E, SK210-6, SK200-6, SK200-4 etc |
Excavator Swing Motor: | E365B, E345D, E345C, E322C, E320D, E320C S6KT, E320D2, E308E, E330D, E330C, E324D etc |
Hyundai Excavator Swing Motor: | R360-7, R320-7, R290-7, R210-7, R170, R140-9, R170W, R130-7,R145-9, R450-7, R220-9, R160-3 etc |
Komatsu Excavator Swing Motor: | PC78, PC220-7, PC220-8, PC210-8, PC800,PC450-8, PC300-7, PC228-3, |
PC220-8, PC220-7, PC200-8, PC200-7, PC130W etc | |
Doosan Excavator Swing Motor: | DX420, DX340, DX300, DX255, DX225, DOOSAN SOLAR 225LC-1, DH500-7, DH470, DH420, DH300-5, DH255-5, DH225-V etc |
JCB Excavator Swing Motor: | JCB160, JCB220, JCB240, JCB330, JS360, B75/76/80 etc |
EC Excavator Swing Motor: | EC360B, EC210B, EC160B, EC140, EC700B, EC460, EC360B, EC240B etc |
Pos. | Part No | Qty | Parts name | Comments |
1 | 434-8903 | [1] | KIT-MOTOR | |
2 | 386-6637 | [1] | KIT-CRANKSHAFT | |
(INCLUDES PARTS MARKED "N" IN GRAPHIC) | ||||
3 | 386-6638 | [1] | KIT-PARKING BRAKE | |
4 | 386-6639 | [1] | KIT-FINAL DRIVE BEARING | |
5 | 386-6640 | [2] | KIT-CHECK VALVE | |
6 | 386-6641 | [2] | KIT-VALVE | |
7 | 386-6642 | [1] | KIT-GEAR | |
8 | 386-6643 | [1] | KIT-GEAR | |
9 | 386-6644 | [1] | KIT-SWING MOTOR PINION | |
(INCLUDES PARTS MARKED "J" IN GRAPHIC) | ||||
10 | 8T-3957 M | [7] | BOLT-SOCKET HEAD (M12X1.75X30-MM) | |
11 | 9S-8004 | [3] | PLUG (9/16-18-THD) | |
PARTS SHOWN IN GRAPHIC(S) WITHOUT A REFERENCE NUMBER ARE NOT SERVICED SEPARATELY | ||||
AVAILABLE REPAIR KIT(S): | ||||
386-6645 J | [1] | KIT-SEAL | ||
(ALSO INCLUDES PARTS MARKED "J" IN THE GRAPHIC) | ||||
J | KIT MARKED J SERVICES PART(S) MARKED J | |||
M | METRIC PART |
About Xinfeng Machinery (XF) parts:
Maintenance method
1. The lubriing oil maintenance cycle of the rotary motor is 1000
hours. In daily operation, we need to observe the amount of rotary
lubriing oil from the dipstick. In some cases, abnormal loss of
lubriing oil will be found, so we need to open the large ring gear
window. Check whether lubriing oil leaks into the large ring gear
cavity through the sealing ring.
2. The general rotation gear inspection and lubriing oil
replacement cycle is every 2000 hours or one year. The butter
filling amount for a 20-ton machine is about 36 liters (two
barrels). Periodically open the boom base and the square cover on
the front of the frame. , to check the ring gear and lubriion
conditions. For maintenance or if water is found, go to the X
overhead cavity at the bottom of the excavator and open the cover
to release the water.
3.There is a common misunderstanding among customers about the
maintenance of slewing bearings. They believe that the lubriing oil
of the slewing bearing is the same as the lubriion cycle of the big
and small arms, and they need to be lubried every day. In fact,
such actions have the opposite effect. If the lubriion cycle is too
short, there will be too much lubriing oil in the bearing, which
will burst the dust ring and leak out.
Advantages
Warehouse Display
Packaging and Delivery
FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.
2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998
3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.
4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.
5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter
getting payment. lf not in stock, we will inform you thetime
requlred.
6. Which shipping term you can supply?
7. What is your MOQ?
A: Small order and sample order are acceptable
8. Do you have any After-Sales service?
A: Yes!Our