Excavator 320CD Swing Motor M5X130 158-8985 For 320CD

Model Number:320C 320D
Minimum Order Quantity:1 Sets
Delivery Time:3-5 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Certifiion:ISO9001
Place of Origin:Guangdong, China
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou China
Address: GuangZhou,CHINA(No.D01,YingFeng building,No1190.Zhongshan avenue central,tianhe district,Guangzhou.)
Supplier`s last login times: within 47 hours
Product Details Company Profile
Product Details

Excavator 320CD Swing Motor M5X130 158-8985 For 320CD


Product Descri

Pos.Part NoQtyParts nameComments
1122-5318[1]BEARING 
2173-3444[1]PLATE 
3173-3472[1]PISTON AS 
4173-3443[1]PLATE 
5173-3441[1]BARREL 
65I-8426 J[1]SEAL-O-RING 
75I-8417 J[1]SEAL-O-RING 
8177-2584[1]PISTON-BRAKE 
95I-8623 J[1]SEAL-O-RING 
10126-2055[20]SPRING 
11173-3439[1]HEAD GP-MOTOR 
 095-0882[2]PIN-SPRING 
12173-3445[1]PLATE-VALVE 
13110-5525[2]PLUG 
143J-1907 J[2]SEAL-O-RING 
155I-8625[1]BEARING 
16173-3451[4]PLATE-SEPARATOR 
17173-3450[3]PLATE-FRICTION 
18173-3442[1]SPRING 
19Z[1]BODY 
20173-3440[1]SHAFT 
21173-3447 J[1]SEAL-OIL 
22094-1900[2]PLUG 
23095-1595 J[2]SEAL-O-RING 
247Y-4268[2]SPRING 
257Y-4267[2]VALVE 
267Y-5221 M[4]BOLT-SOCKET HEAD (M20X2.5X45-MM) 
     
   AVAILABLE REPAIR KIT(S): 
 173-3454 J KIT-SEAL (SWING MOTOR) 
 J KIT MARKED J SERVICES PART(S) MARKED J 
 M METRIC PART 
 Z NOT SERVICED SEPARATELY 











About Xinfeng Machinery (XF) parts:



Maintenance method
1. The lubriing oil maintenance cycle of the rotary motor is 1000 hours. In daily operation, we need to observe the amount of rotary lubriing oil from the dipstick. In some cases, abnormal loss of lubriing oil will be found, so we need to open the large ring gear window. Check whether lubriing oil leaks into the large ring gear cavity through the sealing ring.

2. The general rotation gear inspection and lubriing oil replacement cycle is every 2000 hours or one year. The butter filling amount for a 20-ton machine is about 36 liters (two barrels). Periodically open the boom base and the square cover on the front of the frame. , to check the ring gear and lubriion conditions. For maintenance or if water is found, go to the X overhead cavity at the bottom of the excavator and open the cover to release the water.

3.There is a common misunderstanding among customers about the maintenance of slewing bearings. They believe that the lubriing oil of the slewing bearing is the same as the lubriion cycle of the big and small arms, and they need to be lubried every day. In fact, such actions have the opposite effect. If the lubriion cycle is too short, there will be too much lubriing oil in the bearing, which will burst the dust ring and leak out.


Advantages


Warehouse Display

Packaging and Delivery



FAQ
1. How to quickly and accurately buy products what lneeded?
A: Provide the original parts number to us to check.
2. How long have you been in the excavator
A: We are engaged in excavator parts since 1998


3. lfI don't know the part number,what shouldI do?
A: Please send us size and pictures of old products.
4. What is the warranty of the products?
A: The warranty is 6/12 Months based on the specific product.
5. How long is your delivery time?
A: The normal delivery time is 3-5 days for stock sproductsafter getting payment. lf not in stock, we will inform you thetime requlred.
6. Which shipping term you can supply?

A: By sea,air or by express ( DHL,Fedex,TNT,UPSEMS)


7. What is your MOQ?
A: Small order and sample order are acceptable
8. Do you have any After-Sales service?
A: Yes!Our


China  Excavator 320CD Swing Motor M5X130 158-8985 For  320CD supplier

Excavator 320CD Swing Motor M5X130 158-8985 For 320CD

Inquiry Cart 0