Modular Cleanrooms Achieve 98% Material Reuse For Relocation Projects

Brand Name:ZJNF
Minimum Order Quantity:1
Delivery Time:18days
Payment Terms:tt lc PayPal credit card
Place of Origin:China
Price:negotiate
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: 9th Floor, Block C, Coolpad Building, Intersection Of Keyuan Avenue And Baoshen Road, Nanshan Gaoxin North District, Songpingshan Community, Xili Street, Shenzhen city, Guangdong, China
Supplier`s last login times: within 38 hours
Product Details Company Profile
Product Details

I. Core Design Process

  1. Requirement Planning & Spatial Layout

    • Define cleanliness class (ISO Class 3 to Class 8) and temperature/humidity precision (±0.1°C/±1% RH)
    • Zone functional areas: personnel purification (air showers), material transfer (pass-through windows), core production zones; optimize personnel/material flows to prevent cross-contamination
    • Reserve equipment interfaces: pre-plan equipment locations, electrical conduits, and control system wiring
  2. Structural System Design

    • Framework Selection‌: Aluminum profiles (lightweight) or SUS304 stainless steel (corrosion-resistant) with electrostatic anti-dust coating
    • Enclosure System‌:
      • Walls: Powder-coated steel/stainless steel panels with sealed joints (Class 100 zones require R50mm curved corners to prevent dust accumulation)
      • Viewing windows: Double-glazed tempered glass for visibility and airtightness
    • Floor Treatment‌: Epoxy resin/PVC flooring (chemical-resistant, anti-slip); raised floor return air systems for high-cleanliness zones
  3. Aerodynamic Configuration

    ElementTechnical Requirements
    FFU Layout100% ceiling coverage for Class 100 zones; Class 10,000 zones require ≥25 air changes/hour
    Filtration SystemHEPA+ULPA combination (efficiency ≥99.99%@0.3μm); UV sterilization for Grade A/B zones
    Pressure ControlMaintain 10–15Pa gradients (highest positive pressure in core zones) with smart dampers
  4. Smart Control System

    • 10-inch touchscreen for real-time monitoring of particle count/temperature/humidity/pressure with threshold alarms
    • IoT platform for remote adjustment of HVAC/lighting/FFU speed, reducing energy consumption by 20–30% vs. traditional systems

II. Key Construction Specifications

  1. Factory Prefabrication Stage

    • Dust-free production of modular components (wall panels/FFUs/piping) with pre-installed electrical interfaces
    • Strict QC: Air-tightness testing (≤0.01% leakage rate), material corrosion resistance verification
  2. On-Site Installation Essentials

    • Foundation preparation: Floor flatness tolerance ≤2mm/2m with moisture barrier
    • Building-block assembly:
      
      Non-disruptive construction: No on-site cutting permitted; 500 m²
      basic module assembly within 48 hours
      
                      
  3. Validation Standards

    • Dynamic testing: Continuous 72-hour viable particle monitoring (≤1 cfu/m³ for ISO Class 5 zones)
    • Airflow visualization: Smoke tests to confirm ≤0.1% dead zones
China Modular Cleanrooms Achieve 98% Material Reuse For Relocation Projects supplier

Modular Cleanrooms Achieve 98% Material Reuse For Relocation Projects

Inquiry Cart 0