Home /Mining Machinery /

Construction Multifunctional Rock Core Drilling Equipment

Construction Multifunctional Rock Core Drilling Equipment

Brand Name:zuanshen
Certification:ISO9001
Model Number:ZML160
Minimum Order Quantity:1
Delivery Time:3-5 work days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Chengdu Sichuan China
Address: No. 128, Hailin Road, Rongtai Avenue, Wenjiang District, Chengdu City, Sichuan, China.
Supplier`s last login times: within 2 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

ZML160S rock core drilling equipment


It is widely used in fields such as construction, highways, railways, water conservancy, electric power, tunnels, foundation pits, slopes, and military engineering.

Suitable for rock drilling in drift, egg, gravel layers, and layers covered by fractured and strongly weathered rocks, it can particularly demonstrate its efficient and stable performance. It can quickly and efficiently drill through complex formations and has broad application prospects in various geotechnical anchoring projects.


Main features

Dynamic system

The whole machine can replace different power heads(DTH, top drive, coring) according to construction needs, making construction more convenient, reducing costs, and doubling production;


Rotating arm structure

By adopting a rotary arm structure, the operating range after one positioning is greatly increased. The drilling arm can rotate about 360 °, achieving any angle construction;


Control costs

By using pilot valves and variable piston pumps with load feedback systems, it has the functions of power protection and pressure cut-off. While effectively adapting to the total flow demand of various executing components, it achieves the best power matching under different working conditions and maximizes energy conservation;


Security measures

When drilling, the wind and water linkage system is used to reduce the large amount of dust generated during tunnel construction. While drilling, the crushed stones are washed out of the hole through high-pressure water, reducing the problem of sticking during drilling, achieving the goal of rapid drilling, improving work efficiency, and reducing construction costs;


Pipe shed construction

Both single rod drilling and drilling with casing can be used. When the geological situation is complex and there is collapse, the casing construction method can be adopted, which means the outer casing and inner drill rod drill to the required depth at the same time. Firstly pull out the inner rod, then pull in the steel pipe, finally pull out the outer casing;


Emergency rescue

During the construction process, in case of danger, geological exploration, geological improvement, and support operations in the danger zone can be quickly completed. If the underground space is obstructed by collapse, casing operations can be used to quickly transport air, water, and other rescue materials to the trapped personnel;


Technical specifications


PowerZML-160 electric typeengine55(Kw)
ZML-160 diesel typediesel74(Kw)
ZML-160 double powerengine55(Kw)
diesel74(Kw)
ZML-160 electric work diesel walkengine55(Kw)
diesel37(Kw)
Power headHole diameter90~250(mm)
HammerCIR,DHD
Rock broken waypercussion-rotary
Hole depth20-120(m)
Drill rod typeΦ76/Φ89*1500/2000/3000
Power head rotary speed35-70(rpm)
Power head max torque8000(N.m)
Power head max stroke3500(mm)
Max pulling force80(KN)
Whole machineDimension6600*2000*2700
Air consumption9~22(m3/min)
Drill angle0-360(°)
Rotary angle360(°)
Vice stroke1000(mm)
Rated pressure25(Mpa)
Climbing ability≦ 25(°)
Horizontal height3014mm
WeightAbout 8500kg

Company Overview

China Construction Multifunctional Rock Core Drilling Equipment supplier

Construction Multifunctional Rock Core Drilling Equipment

Inquiry Cart 0