Home /Other Woodworking Machinery /

3Phase 380V UV Wood Finishing Equipment PVC Coating Line

3Phase 380V UV Wood Finishing Equipment PVC Coating Line

Brand Name:FLE
Certification:CE
Model Number:JZ-1300#
Minimum Order Quantity:1 Set
Delivery Time:40-60 working days
Payment Terms:T/T L/C
Contact Now

Add to Cart

Verified Supplier
Location: Suzhou Jiangsu China
Address: Room 224, No. 612, Xingxian Road, Huqiu District, Suzhou City, Jiangsu Province
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Safe Automatic Loading Machine , Hydraulic Lifting Equipment With Double Station


Total amount of the project


  • Payment method 30% as advance payment by T/T after signing contract; 70% paid by T/T after inspection in JINGZHI factory before delivery. Delivery time 40 working days since receiving advance payment( except Chinese national holiday)
  • Packing and transportation Standard export packing and the transportation is carried out by the buyer or the seller is
  • shipped on behalf of the seller
  • Quote validity period Within 15 days from the date of quote
Machine description
The purpose of the automatic UV line solution is to achieve automatic loading, reduce worker labor, and achieve unmanned production goals.
Machine parameters
Large plate size
- Sheet length:800~1800 mm
- Sheet width:1000 mm
- Single piece weight:Max weight 30 KG
- Single piece thickness:3~10 mm
Production line speed
- Adapt to 12-20 m / min UV line speed
- Fast feeding speed of 14 pieces / minute
- Fastest unloading speed is 15 pieces / minute
Electrical control
- Working voltage:380V, 3Phase,50HZ
- Control voltage:24 V, DC
Main component brands
- Mitsubishi PLC control system;
- Delta servo motor;
- Taiwan Shilin low-voltage electrical appliances and inverter;
- Guomao reducer, Sankai reducer, Taiwan Chengbang motor;
- Taiwan Yadeke Pneumatic Components
- Autonics photoelectric switch
Machine power -Loading 5kw,Unloading 5.75kw
Machine color - BS-886 Modern light grey
Total equipment size - see the floor plan
Working height - 880±30 mm
Equipment warranty and after-sales service
1. The supplier company provides equipment installation instructions (including assembly, piping, welding, power distribution, etc.) and technical training for users.
2. Installation and commissioning: The supplier will send the installer to the customer's factory to guide the installation and commissioning of the equipment. The customer is responsible for the accommodation and accommodation expenses of the installer and the local transportation fee.
3. Production Guidance: The supplier provides free production guidance to help the buyer to produce qualified products.
4. Purchasing service: The supplier can provide purchasing services for accessories, raw and auxiliary materials and other items.
5. Quality Assurance Period: The free warranty period is one year from the date of delivery of the contract equipment. After the equipment has passed the warranty period, the supplier still provides long-term technical support and after-sales service.
6. Service guarantee: The equipment responds within 2 hours, arrives at the scene within 24 hours, and eliminates the fault within 72 hours (except for force majeure).
User matching conditions
1. The user needs to prepare the following production conditions before the supplier company sends the installer:
2. 1. Equipment and production line equipment foundation;
3. 2. Forklift (capability ≥ 3T);
4. 3. Compress air and its pipelines, and the pipelines are connected to the relevant fuselage;
5. 4. Power (three-phase five-wire system, the power supply must be grounded), and the cable is connected to the main control cabinet of the equipment;
6. 5. Tools involved during installation and commissioning;
7. 6. The user shall install a temperature and humidity regulator at the automatic paper machine and the electrostatic generator to ensure constant air temperature and humidity;
8. 7. The equipment must be placed in a ventilated, dry environment to be transported to the user;
9. 8. User side staffing: no less than 2 people.

China 3Phase 380V UV Wood Finishing Equipment PVC Coating Line supplier

3Phase 380V UV Wood Finishing Equipment PVC Coating Line

Inquiry Cart 0