

Add to Cart
Aluminum direct refrigeration block ice machine is also called direct refrigeration block ice machine, direct fast
cooling ice machine (block ice machine). The principle is to use
the specially designed cooling channel of the ice making box to
carry on the circulation of the low temperature refrigerant, so as
to rapidly cool the water in the box and realize rapid ice making.
1. Adopt dense special formula aluminum alloy as evaporator, improve heat exchange effect, real rust prevention and corrosion protection, guarantee service life
Weight(Kg/Block) | Dimension(L*W*H mm) | Ice Making Time(Hour) | Batch(times) |
5 | 125*100*600 | 5.5 | 4 |
10 | 155*100*750 | 5.5 | 4 |
15 | 185*125*750 | 7.5 | 3 |
20 | 245*125*750 | 7.5 | 3 |
25 | 315*125*750 | 7.5 | 3 |
50 | 480*160*750 | 11.5 | 2 |
The normal package is wooden box(Size: L*W*H). If export to
european countries,the wooden box will be fumigated.If container is
too tigher,we will use pe film for packing or pack it according to
customers special request.
Q1. What is your terms of packing?
A: Generally, we pack our goods in platict films or cartons,
normally a FCL shipping.
Q2. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the
photos of the products and packages before you pay the balance.
You're welcome to see the test of the machines for days.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 45 to 60 working days after receiving
your advance payment. The specific delivery time depends on the
items and the quantity of your order.
Q5. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q6: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit ;
2. We respect every customer as our friend and we sincerely do
business and make friends with them, no matter where they come
from.
1. OEM Manufacturing welcome: Product, Package...
2. Factory visit
3. We will reply you for your inquiry in 24 hours.
4. After sending, we will track the products for you at proper
time, until you get the products. When you got the goods, our
engineer for the installation and offer training till you 100% give
a satisfacation. If you have any questions about the problem,
contact with us, we will offer the solve way for you.