Add to Cart
12V190 repair tools, cylinder liner pickpocket, valve seat removal
tool, valve guide removal tool, piston ring removal tool, piston
removal tool, valve seat reamer, torque wrench, 190 valve spring
removal tool.
Fork puller tool
Valve guide removal tool (specialized removal)
Spark Plug Sheath Removal Tool
Valve Spring Removal Tool
JICHAI DIESEL ENGINE REPAIR TOOLS 307.42.08 Cylinder Head Nut
Removal Wrench Connecting Rod Bolt Removal Torque Wrench
2V190 Cylinder Liner Pulling Tool Diesel Engine Parts For
Aftermarket Service
Jichai 190 main products are: 6190 parts, 8190 parts, 12V190 parts, Jichai H16V190 parts, gas engine parts, biogas generator set parts, gas engine parts, boat engine parts. Supply 190 parts, body, crankshaft, 12VB.03.00 diesel engine cylinder head assembly, gas engine cylinder head assembly, 16V gas engine cylinder head assembly, 190 connecting rod assembly, connecting rod tile, thrust tile, thrust plate, Z12VB.05.01C piston, 190 cylinder liner, supercharger (20GJ supercharger, SJ160 supercharger, J170 supercharger) intercooler. 12VB.22.00B water pump, JICHAI overhaul kit, complete car mat, 190 camshaft, air motor, electric starter motor, 3411 high elastic coupling, Changsha Zhengsheng piston ring set, 190 intake and exhaust valves and seats, three-core speed sensor, dashboard, STITT spark plug, ignition coil, 127.90.10 high voltage wire, ignition controller, 190 oil filter, 190 accessories 12VB.21.00 Oil Cooler, High Pressure Oil Pump, Governor, Centrifugal Filter, JICHAI Oil Filter, JICHAI 12V190 Parts, JICHAI Air Filter, JICHAI Filter, JICHAI Filter, JICHAI Narrow V-Belt, JICHAI Injector, JICHAI ZCK150S835 Injector Coupling, JICHAI ZCK150S840 Injector Coupling, 12V.29.00 Hand Crank Oil Pump, 307.54. 00 electric pre-supply oil pump, sea water pump, jichai coupling parts.
Jinan Guohua Green Power Equipment Co.,Ltd(JNGH),is a high-tech sales &service company of Jinan Diesel Engine
Co., Ltd. Established in 2010,JNGH has formed a complete system in
sales and after-sales of 190 series engine(jichai
brand:6L190,8V190,12V190.16V190) after eight years experience.
Main business scope:
Early stage:Consultation,designation, supply and erection of engine-based power plants,including diesel generator,natural gas
generator,coal gas generator and biogas generator.
Mid stage:Parts supply of jinan diesel engine(jichai/chidong
brand).JNGH has two warehouses.One located in Jinan which supply
the domestic north and south market.One located in Xinjiang
province which supply the west market.Thus could delivery parts
fast and guarantee the quality.
Later stage:JNGH also offer engine overhaul and maintenance
service.With experienced engineer and professional skills,the
problems could be easy solved.Not only the domestic
China,Ghana,Kazakhstan,Vietnam and Myanmar also could see the trace
of JNGH.
Jichai 190 cylinder head parts is one of the main parts of the
diesel engine, its working conditions are harsh, the use of high
requirements, the performance and reliability of the diesel engine
have a great impact. For this reason, it is required to pay close
attention to its working condition in the process of use, and
regular inspection and maintenance.
1. Frequently check the lubrication condition of the rocker arm
mechanism. When the diesel engine is running at low speed after
starting or when it is pre-feeding pump oil before starting, open
the upper cover of the cylinder head and observe whether there is
oil overflow at the rocker arm bushing, and if it is found that
there is no oil, it should be disassembled and cleaned immediately
and clean the throttle valve at the oil pipe of the diesel engine
on the machine body.
2. Strictly prevent the valve from sticking phenomenon. After the
phenomenon of sticking in the valve, if start the diesel engine
directly, it is easy to have an accident. Sticky phenomenon in the
low temperature environment or poor oil quality is most likely to
occur. Therefore, in the low temperature environment before
starting the diesel engine, must be warmed up, so that the oil and
cooling water temperature rises to more than 20C. Before starting
must also manpower disk crankshaft I 2 weeks, no abnormal phenomena
before starting. Should not be used in the process of long idling.
3. Check the cylinder head frequently for air, oil and water
leakage. If leakage is found, check whether the cylinder head nut
is loose, and tighten it evenly according to the specified torque
if necessary. If the leakage phenomenon can not be eliminated,
should check the relevant parts of the gasket is damaged, if
necessary, replace the new parts.
4. Check the cooling condition of the cylinder head, the use of
cooling water quality should be in strict accordance with the
requirements, so as not to cause the cylinder head cooling waterway
scaling and clogging. If the cylinder head temperature is found to
be too high, should be removed from the cylinder head back to the
mouth of the elbow connection, check whether there is serious
scaling or clogging phenomenon, if necessary, should be cleaned up,
dredging, so as not to cause poor cooling cylinder head, cooling
"dead zone", causing valve sag and other malfunctions.
5. Regular testing and adjustment of valve lash