

Add to Cart
The epoxy powder anti-corrosion process for the inner and outer
walls of steel pipes is currently an efficient and reliable
solution for pipeline anti-corrosion. The treated steel pipe has
significant advantages: its coating not only has excellent
corrosion resistance, capable of resisting the long-term erosion of
various chemical media such as acids, alkalis and salts, but also
has a smooth and dense surface structure, which can effectively
reduce the frictional resistance during fluid transportation and
improve the transmission efficiency of the pipeline. This type of
anti-corrosion steel pipe, with its outstanding comprehensive
performance, is widely used in multiple key fields such as
long-distance oil and gas pipelines, urban water supply and
drainage networks, and industrial fluid transportation.
Internal & External FBE Powder coating
Main equipment:
Item | Process Flow |
1 | Upload pipes |
2 | pipes sprial conveyor |
3 | external blasting |
4 | internal blasting |
5 | Rust removal |
6 | intermediate frequency heating |
7 | FBE powder coating |
8 | Powder recycling system |
9 | load down pipe rack |
√ Set up domestic high-end plastic machinery expert workstation, with
more than 10 patented technologies
√ 9 senior engineer team, refined FBE powder curing parameters and
3LPE interlayer bonding process
√ 4000 m2 intelligent factory, strict implementation of ISO9001 quality
control system
√ 100% test run before the equipment leaves the factory, the
operation stability reaches 99.8%
√ Set research and development, production in one, to ensure the
technology and equipment performance
Question & Answer:
Q1. What is Size of Pipe Dia. your equipment can produce ?
A: We can produce four main Model:
Diameter of steel Pipe:
48-219mm.
219-1220 - mm
325-1600 - mm
508-2400 - mm
1000-3200mm
Q2. What is Descaling grade?
A:SA2.5?
Q3. What is your anticorrosion coating standard?
A: It can meet SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 ,
DIN 30678 and coating specification requirements from American
Corrosion Association, and DNV . The product pipe fully complies
with SY/T0315-2005 ,CNPC38-2002 "Technical specifications for
double-layer fusion-bonded epoxy powder coating on buried steel
pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time
A: 2-3monthes after deposit.
Q5. Production output:
A: It is different output capability as different pipe diameter,
the Max. is 3 to 8 km/day, and annual processing capacity is 2
million square meters (Φ508 mm).
Q6. Coating thickness:
A: 80~800um
Q7. Which country did you sell your 3PE equipment?
A. We have produced nearly 50sets 3PE processing line at home and
abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan
and so on.
Q8. After-sales service:
A: Warranty period:
Before delivery all the equipment must be trial operated to confirm
the quantity perfectly.
The warranty period is 12 months from the date of pick-up for
mechanical part , and 6 months for the electrical part. The seller
provides free technical services and provides training and guidance
to buyer operators.