Anti-Corrosive Blasting Coating Steel Pipe 3-Layer PE Pipe Machine

Brand Name:HUASHIDA
Certification:ISO9001
Minimum Order Quantity:1
Delivery Time:come to an agreement in respect of the delivery time
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Place of Origin:Qingdao,Shandong,China
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Anti-Corrosive Blasting Coating Steel Pipe 3-Layer PE Pipe Machine

Description


The coating technology allows to obtain the anticorrosive three-layer polyethylene/polyetylene coating, which consist of:Epoxy layer,copolymer layer (bonding agent),polyethylene/polypropylene layer.


Anticorrosive coating 3LPE/ 3LPP according to PN-EN ISO 21809-1 is composed of:
Epoxy layer of minimum 125 μM thickness,
Copolymer layer of minimum 150 μM thickness,
Polyethylene or polypropylene layer from 1,8 mm to 4,7 mm.


Main Equipment List

No.NameSet
A. Derusting Equipment
1Pipe conveyor1
2Shot Blasting machine1
3Cyclone Dust Collector1
4Catridge dust collector1
5Centrifugal exhaust fan1
6PLC control system1
B. Coating equipment
1Conveyor1
2Heating device1
3Powder spraying device1
4Cooling Spray equipment1
C.Platform
1Steel pipe platform1
2Post-rust removal transition platform1
3Hydraulic Equipment3

Q1. What is Size of Pipe Dia. your equipment can produce ?
A: We can produce four main Model:
Diameter of steel tube:
48-219mm.
219-1220 - mm
800-1600 - mm
1000-2400 - mm

Q2. What is Descaling grade?
A:SA2.5?
Q3. What is Delivery Time
A: 2-3monthes
After-sales service:
Warranty period:
The mechanical part warranty is 12 months from the date of pick-up, and the electrical part is 6 months.
Service:
The seller provides free technical services and provides training and guidance to buyer operators.


Our Services
3LPE coating processing line Quality guarantee period:12 months or 14 months from date of Bill of Lading.
During this period, the seller will provide free service for all problems caused by quality of equipments, however except the problems caused by the buyer .because of wrong operation.
Service:The seller would send technician to the buyer's factory to test the new machine and train people of the buyer. The buyer should pay for round-trip transportation expense, food, accommodation, insurance locally and related salary.


China Anti-Corrosive Blasting Coating Steel Pipe 3-Layer PE Pipe Machine supplier

Anti-Corrosive Blasting Coating Steel Pipe 3-Layer PE Pipe Machine

Inquiry Cart 0