Product Details
Gas/Water Supply HDPE Pressure Pipe Extrusion Line HDPE Solid Wall
Pipe Extrusion Line
---Pipe diameter range:16-63mm 75-250mm 160-315mm 200-450mm
315-630mm 500-800mm 630-1200mm
---The extrusion line comprise equipments and devices as below,
1set Vacuum loader
1set Hopper dryer
1set High-effeciency single screw extruder
1set 25/25 single screw extruder for mark line
1set Vacuum calibration table
2sets Water spraying tank
1set Hauling machine
1set Cutting machine
1set Stacker
1 | Automatic Vacuum Feeder and dryer | 1 set |
2 | SJ-120/33 high efficiency Single Screw extruder | 1 set |
3 | Co-extrusion die mould(315,400,450,500,630 mm) | 6 sets |
4 | SJ-25/25 marking line extruder | 1 set |
5 | SRQJ-630 6m vacuum calibrating stand | 2 sets |
6 | SRQJ-630 5.5m spray cooling flume | 2 sets |
7 | SRQJ-630 6 caterpillar pulling machine | 1 set |
8 | SRQJ-630 planetary cutting machine | 1 set |
9 | SRQJ-6000 stacker | 1 set |
10 | PLC (Siemens ) central control system | 1 set |
HDPE pressure Pipe Extrusion Line is a pipe extrusion line
developed by HSD company through assimilate and master technology
introduced from abroad. It is applicable for extrusion of PE, PP,
PB, PERT, ABS etc. This PE pipe production line can instead
extrusion line imported from abroad.
This pipe extrusion line mainly includes single screw extruder,
molds, vacuum calibrating water tank, spray water cooling tank,
haul-off machine, cutting machine and bracket.
Production range:
Style | PE16/63 | PE75/160 | PE160/315 | PE200/450 | PE-315/630 | PE-500/800 | PE-710/1200 |
Main extruder | SJ-65/30 | SJ-75/33 | SJ90/33 | SJ90/33 | SJ-120/33 | SJ-120/33 | SJ-150/33 |
Main motor | 55kw | 90kw | 132kwDC | 160kwDC | 185kwDC | 250kwDC | 400kwDC |
Pipe diameter | Φ16-63mm | Φ75-160mm | Φ160-315mm | Φ200-450mm | Φ315-630mm | Φ500-800mm | Φ710-1200mm |
Capacity | 80-100kg/h | 180-250kg/h | 280-400kg/h | 350-500kg/h | 450-600kg/h | 700-900kg/h | 800-1200kg/h |
Main machine- High-effeciency single screw extruder
---Single screw is with barreir & mixing head; Barrel is new model
with slotting (channel), Both make security of good jellification,
large output and stable performance.
Company Profile
1. Our Factory
Qingdao Huashida Machinery Co., Ltd. is located in Qingdao High &
New Technology Industrial Area- Qingdao Huashida industrial Park,
covers an area of about 4000 square meters. We have tens of years
experience in plastic pipe, sheet, and board extrusion lines, and
pipe joints and welding tools such as heat shrinkable sleeve,
Electro fusion sleeve etc.

2. Our main products
Our main products include as following,
HDPE PU pre-insulation Jacket Pipe extrusion line
3PE steel pipe anticorrosion&coating machinery
Rubber&plastic foam flexible insulation tube/sheet production
line
HDPE water supplying pipe extrusion line
PE PP sheet board extrusion line
Heat shrinkable sleeve production line
Hollow wall spiral pipe production line
Plastic welding rod extrusion line
Radiation cross-linked PE heat shrinkable sleeve
Electro fusion tape
Portable extrusion welder

3. Our products Application.
Our machines make products what are widely used as jacket pipe of
PU foam insulation pipe in municipal heating pipe system; Municipal
water supplying and drainage pipeline; Oil and gas pipeline; Pipe
joints of plastic drainage water pipes, PU foam insulation
pipelines, 2PE/3PE oil and gas pipelines;
Besides manufacturing machines, we also make Heat shrinkable
sleeves and electro fusion sleeves and plastic welders, which are
widely used as pipe joints and sealings of plastic drainage water
pipes, PU foam insulation pipelines, 2PE/3PE oil and gas pipelines;
4. Our certificates and Patents
5. Our Purpose and Market
Our purpose is to supply highest cost-effective products and the
most suitable solutions to our clients, as well as intimate help
and service, on this basis we reach a win-win situation.
For over 14years We have exported to many foreign countries, such
as Russia, Iran, Turkey, U. A. E, Sudan, Ukraine, Uzbekistan,
Azerbaijan, South Asia, Poland etc.
6. Guarantee and after service
The guarantee period is 12 months from the date of installing, but
no more than 14 months from the date of delivery. After this period
we are obliged to provide with lifelong service at the expense of
Buyer.
During the warranty period we are responsible to provide trouble
shootings and help the customer to solve the problems, provide
spare parts which are broken, except breakings caused by the Buyer.
We will provide the technical service train the workers from the
buyers for free.
We can also send technicians to the buyer's companies abroad for
help installation and testing the lines. But the buyer shall pay
for the round trip tickets, accommodation, transportation, medicine
treatment and insurance of the technicians in foreign countries and
some salary accordingly.
