Three Layer Anti Corrosion 3PE Pipe E Coating Machine Anti Corrosion Blasting Production Line

Brand Name:HUASHIDA
Certification:ISO9001
Minimum Order Quantity:1
Delivery Time:come to an agreement in respect of the delivery time
Payment Terms:L/C
Place of Origin:Qingdao,Shandong,China
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: 69 Jinsheng Second Road Chengyang District, Qingdao, Shandong, China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Three Layer Anti-Corrosion 3PE Pipe e Coating Machine Anticorrosion Blasting Production Line

3PE anti-corrosion coating production line, is three PE anti-corrosion structure of anti-corrosion pipeline production line, diameter range φ60 ~ φ1420, wall thickness range of 2.5-18mm, the use of three anti-corrosion. Namely, a layer of epoxy powder (FBE> 100µm), the second layer of adhesive (ad) 170 ~ 250µm, the third layer of polyethylene (PE) 2.5 ~ 3.7mm

Corrosion resistant steel pipe can be divided into two categories, inner lined anti-corrosion steel pipe and anti-corrosion steel pipe. Inner lined anti-corrosion mainly cement mortar lining anti-corrosion steel pipe application more, lower cost, using cement mortar coating on the pipeline to play a preservative effect. Outer wall anti-corrosion steel pipe applied more 3PE anti-corrosion steel pipe. Anti-corrosion technology with Huashida 3PE anti-corrosion coating production line is the process of protecting the outer wall or inner wall of the steel pipe to protect the pipeline itself. On the straight seam steel pipe, spiral pipe and other pipes can be processed. Huashida production line, the establishment of a sound quality assurance system, has passed ISO9001: 2000 certification, the implementation of the whole process of quality tracking control, reliable quality. Customers can assure.

Steel pipe outside shot blasting derusting operation line
No.DescriptionQty.Remark
1Transmission line1set
2Shot blasting derusting line1set
3Cyclone dust collector1set
4Pulse filter cartridge dust collector1set
5Centrifugal wind blower1set
6Derusting equipment electrical control system

1set

Steel pipe outside spiral 3PE production line
No.DescriptionQty.
1Coating transmit system1set
2Intermediate frequency heating system1set
3Epoxy spraying system1set
4Automatic feeding dryer2sets
5single screw high efficiency extruder SJ-65/30

1set

6SJ-120/30 extruder1set
7Hot melt adhesive extrusion die head1set
8PE sheet extrusion die head1set
9Hot melt adhesive/PE sheet press device1set
10Stainless steel spray powder chamber1set
11Cooling water spray system1set
Platform system
No.DescriptionQty.
1Steel pipe up load platform1set
2Derusting transition platform1set
3Finished pipe storage system1set
4Hydraulic system3sets
Grooving system
No.DescriptionQty.
1PE grooving device2sets
2Hydraulic elevating pipe turner2sets
3Operating cabinet1set


No.NameUnitQtyRemarks
External cleaning and 3PE system of the steel pipes
1Flatform of Upload pipesM15Combination of dual structure
2Hydraulic tube pulling machineset8Double lift,lifting force
more than 8T
3Air hydraulic stationSet3Air cooler, throttle valve
4Derusting spiral transmission lineM27Variable frequency speed regulation, solid tyre
5Synchronous dynamic spiral single-frameSet2Variable frequency speed regulation, solid tyre
6The lower type shot blasting machineSet1Max pipe diameter 1220mm
7Dedusting systemSet1first degree dust removal + pulse bag type dust collector
8transition platform line
M15Combination of dual structure
9PE Spiral transmission lineM54Variable frequency speed
regulation,solid tyre
10Intermediate frequency heaterSet1800K
11Dynamic high temperature rollerSet1Variable frequency speed
regulation
12Epoxy powder coating systemSet1Max pipe diameter 1220mm
13The powder room, vulcanization barrelSet1Non inductive heating
material
14two stage powder recovery deviceSet1cyclones dust collector+
pulsed dust collector
15Automatic vacuum feeding machineSet2800kg/h+300kg/h
16SJ-180/30Extruder
SJ-180/30Extruder
Set1Q≈650kg/h
250KW DC,Q≈650kg/h

17SJ-65/30 Extruder
SJ-65/30 Extruder
Set145KW Q≈150kg/h
45KW AC,Q≈150kg/h
18Extruder moving mechanismSet1Electric control
19Hot melt extrusion die headSet1T die head
20PE sheet extrusion die mouldSet1T die head
21Hot melt adhesive
PE coating device
Set1Silicon rubber roller,
double cylinder, internal
water cooling
22Environmental protection ventilation systemSet14KW
23cooling spray systemSet1Water pump, water spray, pipelines, reflux tank
24The cooling splash-prevented plastic curtain-wallSet1Approx 110m2
25External anti-corrosion pipe unload platformM15Combination of dual structure
26Pipe beveling grinding machineSet24KW motor electrical control system of walking
27Dedusting systemSet2Pulse dust collect
28Hydraulic lifting rotary pipe deviceSet1Hydraulic lift,the four round of the WPA direct drive
29The electrical control system of 3PE steel pipes production lineSet1main line of centralized
control/individual/control
PLC Control

compressed air system
30Screw type air compressorSet16m³/min,0.7MPa
31freeze drying machineSet16m³/min,Enter temperature≤80ºC
32Precision filterSet30.1PPM
33Gas tankPC11m³



Technological processes:
Upload pipes→pipes screw conveyor→rust removal of intermediate frequency heating→Epoxy powder coating→outer layer soli quid & polyethylene coating→cooling spray→pipes screw conveyor→grinding pipes, send→unload pipes

Company profile

Huashida Machinery, with over 21 years' experience, is one of the professional 3 layer pe steel pipe anti-corrosion coating processing production line manufacturers in China. Offering the customized service, we warmly welcome you to get the high qualified products from our factory.


Our Services
3LPE coating processing line Quality guarantee period:12 months or 14 months from date of Bill of Lading.
During this period, the seller will provide free service for all problems caused by quality of equipments, however except the problems caused by the buyer .because of wrong operation.
Service:The seller would send technician to the buyer's factory to test the new machine and train people of the buyer. The buyer should pay for round-trip transportation expense, food, accommodation, insurance locally and related salary.







China Three Layer Anti Corrosion 3PE Pipe E Coating Machine Anti Corrosion Blasting Production Line supplier

Three Layer Anti Corrosion 3PE Pipe E Coating Machine Anti Corrosion Blasting Production Line

Inquiry Cart 0