ZB200 100 Ft Steel Bailey Bridge / Double Truss Single Storey DS Fast-Installed

Brand Name:EVERCROSS
Certification:CNAS; COC; PVOC; SONCAP; CIDB;FORM E;FORM L; FORM M, etc
Model Number:COMPACT-200; COMPACT-100; CHINA 321 ; PB 100; LSB; GWD; DELTA; 450,etc
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: 10th Floor, Building 1, No. 188 Changyi Road, Baoshan District, Shanghai,China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

ZB200 100 Ft Bailey Bridge / Double Truss Single Storey (DS) Fast-Installed

Bailey Bridges Description:

Bailey Bridges which are portable steel bridge have been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.



Bailey bridge panel consists of panels, pins, post end, bolt, chord reinforcement, truss bolt and chord bolt.

Bridge deck system includes beam, longitudinal beam, bridge panel, edge material and so on.

Connecting system comprises a diagonal brace, a connecting plate, a support frame, and a pull bar.
The bridge base is composed of bridge seat (support), seat plate, lap plate, lap plate support, etc.


Bailey Bridges Specifications:

Single lane:Standard roadway: 3.15m / 4.2mSingle lane: 30ft-200ft
Double lane:Standard roadway:7.35mDouble lane:30ft-180ft
Load: design according to different requirementsDeck: steel deck
Bridge type: CB100, CB200 





Bailey Bridges Introduction

Bailey Bridge is a standard bridge equipment, adopted extensively and the most popular in the world.






Mixture form to erect all kinds of Bailey Bridges

Temporary Bridges, Emergency Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of varied span can be erected.

Bailey bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in, and the bridge is strong enough to carry. It is considered a great example of military engineering.

Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.


Bailey Bridges Application


The Bailey bridge has been widely used around the world, both in military and civilian applications. Its versatility, rapid assembly, and cost-effectiveness have made it a popular choice for emergency bridge construction and infrastructure development projects.

It is mainly used for setting up single-span temporary Bridges, ensuring that various vehicles with crawler load of 500KN and lower than tire load of 300KN (axial pressure of 130KN) pass through rivers, broken Bridges, gullies and other obstacles, and can be used to repair damaged bridges, and can also be used to build construction towers, supporting frames, gantry frames and other assembled steel structures.


Bailey Bridges Advantage

Possessing the features of simple structure
Convenient transport, speedy erection
Easy disassembling
Heavy loading capacity
Great stability and long fatigue life
Being capable of an alternative span, loading capacity


Bailey Bridges Competitive Advantage:


Heavy loading capacity

Great stability

Long fatigue life

Light weight

Low cost

Easy and fast erection

Evercross Steel Bridges Overview:


EVERCROSS STEEL BRIDGE SPECIFICATION
EVERCROSS
STEEL BRIDGE
Bailey bridge (Compact-200, Compact-100, LSB, PB100, China-321, BSB)
Modular bridge (GWD, Delta, 450-type, etc.),
Truss Bridge, Warren bridge,
Arch bridge, Plate bridge, Beam bridge, Box girder bridge,
Suspension bridge, Cable-stayed bridge,
Floating bridge, etc.
DESIGN SPANS10M TO 300M Single span
CARRIAGE WAYSINGLE LANE, DOUBLE LANES, MULTILANE, WALKWAY, ETC
LOADING CAPACITYAASHTO HL93.HS15-44, HS20-44, HS25-44,
BS5400 HA+20HB, HA+30HB,
AS5100 Truck-T44,
IRC 70R Class A/B,
NATO STANAG MLC80/MLC110.
Truck-60T, Trailer-80/100Ton, etc.
STEEL GRADEEN10025 S355JR S355J0/EN10219 S460J0/EN10113 S460N/BS4360 Grade 55C
AS/NZS3678/3679/1163/Grade 350,
ASTM A572/A572M GR50/GR65
GB1591 GB355B/C/D/460C, etc.
CERTIFICATESISO9001, ISO14001, ISO45001, EN1090, CIDB, COC, PVOC, SONCAP, etc.
WELDINGAWS D1.1/AWS D1.5
AS/NZS 1554 or equivalent
BOLTSISO898, AS/NZS1252, BS3692 or equivalent
GALVANIZATION CODEISO1461
AS/NZS 4680
ASTM-A123,
BS1706
or equivalent









China ZB200 100 Ft Steel Bailey Bridge / Double Truss Single Storey DS Fast-Installed supplier

ZB200 100 Ft Steel Bailey Bridge / Double Truss Single Storey DS Fast-Installed

Inquiry Cart 0