Aluminum Demountable Partition Wall Installation Guide with Video

Brand Name:Glawall
Certification:SGS, ISO 9001,UL, CE
Model Number:every style (framed/frameless) double glass
Minimum Order Quantity:10 square maters
Delivery Time:25 days
Payment Terms:L/C,D/A,D/P,T/T,Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Foshan China
Address: The 3rd Workshop of Luzhaoxiang, Shatou Xiqiao Industrial Zone (New District), Jiujiang Town, Nanhai District, Foshan City, China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details


Professional Installation Process for Demountable Partition Walls
Demountable partition walls offer flexibility, speed, and precision in space division—whether for offices, co-working spaces, or commercial interiors. Our streamlined installation process ensures seamless assembly, structural integrity, and a flawless finish.


Step-by-Step Installation Guide


1. Planning & Design✔ Space AssessmentMeasure floor plans, ceiling height, and load-bearing requirements
✔ Custom LayoutsOptimize wall placement for privacy, acoustics, and traffic flow
✔ Material SelectionChoose glass, aluminum, or hybrid panel systems
2. Site PreparationFloor & Ceiling InspectionEnsure level surfaces (±2mm tolerance)
Clearance & SafetyRemove obstacles, mark electrical/plumbing zones
Modular Grid MappingLaser-guided alignment for track positioning
3. Track InstallationHeavy-Duty Aluminum ChannelsAnchored to ceiling/floor with seismic-rated brackets
Precision LevelingAdjustable shims compensate for uneven surfaces
Load TestingVerified to support 200kg/m² vertical loads




4. Panel Assembly✔ Pre-Assembled ModulesGlass or solid panels slide into tracks (no welding/gluing)
✔ Acoustic SealsSilicone gaskets reduce sound transmission by 5-8dB
✔ Tool-Free AdjustmentsCam-lock system enables millimeter-perfect alignment
5. System IntegrationDoors & Operable WallsPivot/sliding doors installed with auto-latching hardware
Cable ManagementIntegrated wire channels for power/data
Hybrid AttachmentsCompatible with whiteboards, shelving, or green walls
6. Quality AssuranceLaser Alignment CheckEnsures walls are plumb (±1.5mm variance)
Operational TestingDoors, moving parts, and acoustic seals verified
Client WalkthroughFinal inspection with sign-off protocol



Installation steps


  • Paetition up the celling
  • Wall starter installation
  • Celling connection installation
  • Bottom connection installation
  • Conner pole installation
  • Horizontal panel
  • Vertical panel
  • Bind panel

Wall starter installation & vertical adjustment
Regulate the vertical adjusting pole tothe vertical position by the M8*30bolt,and fix it with the side groove byself-tapping screw

Top and bottom groove installation&vertical
Vertical adjusting pole should be samecenter line with top and bottom groove

  • Corner pole installation
  • Horizontal panels connection
  • Vertical panels connection
  • Blind installation


Each model has a different installation method. We'll provide detailed instructions in PDF format and a video tutorial.
Please contact us to start a chat!~


China Aluminum Demountable Partition Wall Installation Guide with Video supplier

Aluminum Demountable Partition Wall Installation Guide with Video

Inquiry Cart 0