

Add to Cart
Steel Structure Frame | |
A steel structure is a metal structure made of structural steel members that are connected to each other to carry loads and provide complete rigidity. | Hot-rolled H-section steel is an economical section high efficiency profile with more optimized cross-sectional area distribution and more reasonable strength-to-weight ratio. It is named H steel, because its cross-section as the English letter "H". Hot rolled H-section steel has the advantages of strong bending resistance, simple construction, cost saving and light weight. So now it has been widely applied in steel structure. |
Roof and Wall Cladding System | |
Cladding system in steel structure construction plays an important part. It affects the whole building's energy consumption. | Steel sheet, which is the cheapest without any insulation. EPS Sandwich Panel, which is good insulated but flammable. Glass Fiber Sandwich Panel,which is with general insulation but non-flammable. Rock Wool Sandwich Panel, which is with good insulation and is non-flammable. Pu sandwich Panel , which is most expensive, with prefect insulation and non-flammable and waterproof. |
Connecting Bolts | |
In the site installation, the steel structure components normally adopt bolt connection for the quick and easy processing. In order to meet the bolt connection requirements, the manufacture needs to make holes in the corresponding positions on the surface of the steel components. And the holes' position and dimension must meet the specification requirements. If the installation has trouble of unqualified holes on the site, it will needs the manufacturing rework. It will cause the extra economic losses. |
Certification Service
We support third-party factory inspections and quality verification, like SGS, BV, ITS. Till now, we have made various certifications to meet different regions policy. There are SGS, ISO, CE, EN1090, EXC etc.
Workshop Visit and Product Check Service
You are warmly welcome to visit our production lines before the order, your project processing during the production and finished steel components in the packing and loading.
Flexible Payment
Different payment terms like T/T, LC, with FOB, CIF, CFR on options.
Design Service
For products, we accept the production exactly same as your own drawing details. Different standards or the equivalent exchange are both acceptable.
If you have only ideas, we could offer free architectural design and production for you.
Production Service
All raw materials are purchased from qualified mills and the
materials quality should be checked when received.
Quality control will be done in each production progress to
guarantee every steel component quality. And each component will
packed and protected before the shipment.
Installation Support
We offer free assemble guide and solve any technical questions in the installing time.
If the client has the demands, we could also send our engineer to guide or send our installing team to install on site. Different plans are for clients' option.
steel structure frame | Bulk loading (without steel palllet) | Normally 40' OT |
Steel Pallet Loading | Normally 40' HQ (Small size will be in 20'GP) | |
roof and wall system | Bulk loading (without steel palllet) | Normally 40' HQ (Small size will be in 20'GP) |
Small connecting bolts and accessories | wooden box | Loading together with other parts |
Steel Structure Building Installation steps:
1.Foundation construction (pre-embedded anchor bolts),
Installing detailed drawing will be offered in advance.
2. Column installation
One worker commands truck crane how to move, 3 ~ 4 workers cooperate with crane to install the steel column, put column to anchor bolt location.
3.Beam installation
After completing the installation of adjacent two steel column, then main beam begin to install.
4.Installing roof & wall purlin
The roof and wall purlin will be installed after finishing column and beam. Bolting the purlin on the main structure.
5.Fixing wall and roof sheet
To fix the wall sheet on wall purlin by self-tapping screw; then fix the roof sheet.
6.Fixing the cover
To install the cover on the corner, eave, window and door opening.
7.Install windows and doors.
We will offer detailed drawings to guide your installing process. Meanwhile, we still offer free technical questions solve in time. And further we offer different plans to choose for different demands.
On-line technical guide in time;
1-2 engineers to guide on site;
Our installing team process all assemble for the client.
Exacuted Projects:
Welcome to Contact further & Visit!
Tell us | Offer our customized solution & budget | Confirm and start |
Share your project requirements, drawings or ideas as detailed as possible | Our team will develop the best solution based on your specifications and provide an budget for you. | After your approval,we'll start detailed drawing for production and manage every aspect of delivery and installation. |