

Add to Cart
Gongyi UT Machinery
WhatsApp/Viber/Phone: 0086-18236968979
Skype: orion.chai
Super quality sweet pepper seeds seeder planter, 500 tray per hour flower seeds seeder
Working theory:
Air aspiration type seeder is use the high speed fan to produce negative pressure, and pass on to the vacuum chamber of the seeding machine. When seeding tray returned, it will adsorb the seed and rotate with the seed tray. When the seed rool out the vacuum chamber, it will not bear negative pressure, and fall down to the tray by the self weight.
Specification:
1) This machine is air-aspiration type seeder.
2) Adopts mechanical arm type swing equipment, operation is flexible and convenient.
3) One tray per seeding, high efficiency, the capacity is 750 tray per hour.
4) The seeding accuracy is more than 95%-98%.
5) Have the equipment of seed recovery after seeding.
1.WHAT SERVICES DO WE OFFER?
Pre-sale communication → Design proposal, signature confirmation→
Customized production→ Test machine before shipment →Package &
delivery→ Engineer installation→Training operator → Technical
support
2.PAYMENT TERMS:
50% of total amount should be paid by T/T as down payment ,the
balance (50% of total amount) should be paid before delivery by T/T
or irrevocable L/C by payment(at sight).
3.DELIVERY CONDITIONS:
3.1 Delivery condition: FOB Qingdao/ Shanghai port or CIF destination Port.
3.2 Delivery terms: Within 10-14 working days after receipt of
advanced payment, the seller should inform the buyer to do
inspection,the seller should finish packing of goods and ready for shipment within 15 working days after the seller receipt the full
payment.
4.WARRANTY TERMS
5.1 Warranty period: 12 months, starting from the machine receipt
in customer's warehouse
5.2 Seller shall grant: services and spare parts, free-of-charge
service throughout the entire equipment during warranty period.
5.3 long life service: the seller should provide long life service for
the sold goods, the buyer pay for needed spare parts after the
12months warranty terms.
5.INSPECTION
When the machine finished, the seller should inform the buyer to do
inspection before shipment, the seller guaranty good performance of
all the sold goods.the seller undertake the material cost for the
machine inspection in seller's factory. the buyer should come to
seller's factory to do the inspection work, or the buyer could
entrust any third party to come to seller's factory to do the
inspection work.
6.INSTALLATION AND EQUIPMENT COMMISSIONING:
if the buyer requires, the seller should send technician team to
buyer's factory for installation and testing the whole line, and
the buyer should undertake the whole food/place and round tickets
(airplane, food, hotel, and so on), and pay salary to engineer for
100 usd/day/engineer.
Shipping and packing:
1.Waterproof packing with the international export standard by 20ft,
40ft, 40hp container.
2. Equipment Fittings, Electric Motor and Power Cabinet will be
packed in Wooden Case or Iron Box. Other equipment will be packed by Color-Stripes Plastic Cloth.
3. Or as per customer's requirements.
Contact: