Stage 1: Structural Reinforcement
Fabricate load-bearing framework using galvanized steel channels
(min. 14-gauge), securing to ceiling joists with seismic-grade
brackets spaced ≤16" apart. Verify structural integrity for 3×
equipment weight capacity (min. 330lbs).
Stage 2: Core Unit Mounting
Position the aerodynamic housing onto vibration-damping isolators
(included), maintaining 6" clearance from adjacent surfaces. Torque
M12 mounting bolts to 45Nm using crisscross pattern.
Stage 3: Ductwork Integration
Engage the directional flange with cabinet's exhaust collar using
quarter-turn interlock system. Conduct smoke-pencil test to confirm
zero leakage at 2" static pressure.
Product Performance Specifications
Model Num | A | B | C | D | E | F | Cutout Dimensions |
BPT10-12 | 280 | 280 | 277 | 155 | 230 | 14 | 230*240 |
BPT10-15 | 280 | 280 | 277 | 155 | 230 | 14 | 230*240 |
BPT10-21 | 280 | 280 | 277 | 155 | 230 | 14 | 230*240 |
BPT15-27 | 380 | 380 | 341 | 224 | 306 | 14 | 306*306 |
BPT15-33 | 380 | 380 | 341 | 224 | 306 | 14 | 306*306 |
BPT15-40 | 380 | 380 | 341 | 224 | 306 | 14 | 306*306 |
BPT15-60 | 380 | 380 | 341 | 224 | 306 | 14 | 306*306 |