Counterflow BAC Cooling Tower Fill Bundles PVC Cooling Tower Fills Supplier

Brand Name:Xcell Energy
Certification:SGS
Model Number:XL-385-BAC
Minimum Order Quantity:1 Set
Delivery Time:7 Days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Suzhou China
Address: Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Supplier`s last login times: within 27 hours
Product Details Company Profile
Product Details

BAC Counterflow Fill Bundles For Counterflow Cooling Tower

Cooling tower water pouring material is made of PVC plastic sheet, which sprays water filler has good thermal properties, the basic function of ventilation resistance is small, smooth and not easy blockage, can maintain the long-term stability of the cooling characteristics.

  

Hardly any deformation under 65 degrees Celsius, not burst under minus 35 degrees Celsius.

  

Plastic water spray packing assembly good stiffness, carrying capacity is strong, under the condition of normal operation, use, not twisted, loose deformation, can maintain stable run efficiently.

  

Water spray packing glass plastic uniform, no scattering undesirable materials, exterior colour and lustre is consistent, not attached on the surface of the oil.

  

Benefits For BACount fill bundles for counterflow cooling tower

  • guaranteed performance

  • easy to handle, lift, dismantle and rebundle

  • easy inspection of fill core: by bundle and by sheet

  • easy to clean

  • reduced fouling

  • perfect fit because of model specific size

Characteristics For BA C Count fill bundles for counterflow cooling tower

  • Maximum air and water contact

  • self-extinguishing PVC material, impervious to rot and biological attack

  • for temperatures up to 55°C

High temperature needs

BAC ount bundles are also available in CPVC/PP for temperatures up to 65°C/80°C.



Related Cooling Tower Film Fill

PACKING AND DELIVERY




FAQ


Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

China Counterflow BAC Cooling Tower Fill Bundles PVC Cooling Tower Fills Supplier supplier

Counterflow BAC Cooling Tower Fill Bundles PVC Cooling Tower Fills Supplier

Inquiry Cart 0