BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Brand Name:BAC
Certification:SGS
Model Number:BAC cooling tower parts
Minimum Order Quantity:1 Set
Delivery Time:7 Days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Suzhou China
Address: Room 306, Building A06, No. 66 Wanyuan Road, Dianshanhu Town, Kunshan City, Suzhou, China
Supplier`s last login times: within 27 hours
Product Details Company Profile
Product Details

BAC Cooling Tower Filler | Cooling Tower Heat Dissipation Film

Specifications:

Tech Date
Sheet Width(mm)1300mm
Sheet Length2440mm/customized
Thickness0.38-0.6mm/customized
Sheet Spacing20mm
Colorgrey/black

The principle of operation of cooling tower fill is to put as much water surface area in contact with as much air as possible, for the longest amount of time possible. Film fills allow the water to form thin flowing sheets to expose as much water surface area as possible to the interacting flow.
Cooling tower sheet fills or media, come in many different forms and "micro-structures," each having unique characteristics to fit various applications. Film fills are selected for direct replacement, performance enhancement, and water condition compatibility. Each fill has performance characteristics that allow selections to be made for various heat loads, flow rates, water quality, and horse power combinations.


Related Cooling Tower Film Fill


• Outstanding thermal performance, will meet or exceed the performance of any OEM fill
• Unique method for quick and easy field installation, saves labor
• Nested shipment requires smallest fill staging area and low shipping costs
• Model-specific kits contain everything needed for an efficient installation, including detailed instructions, supports, hardware, and fill
• 2-week standard lead time

PACKING AND DELIVERY








FAQ


Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

China BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film supplier

BAC Cooling Tower Fill Replacement Cooling Tower Heat Dissipation Film

Inquiry Cart 0