Add to Cart
XHBB128B Transformer turns ratio tester
In the production process of semi-finished and finished power
transformers, before the newly installed transformer is put into
operation and according to the preventive test regulations of the
Ministry of Electric Power, it is required to test the turns ratio
or voltage ratio of the operating transformer, and the transformer
turns ratio can be checked. The correctness, the condition of the
tap changer, whether the transformer is short-circuited between
turns, whether the transformer can be operated in parallel. The
reading of the traditional ratio bridge is not intuitive, and the
conversion can only be carried out phase by phase.
This transformation ratio tester overcomes the shortcomings of
traditional transformation ratio bridge testing. It is easy and
intuitive to operate. It adopts three-phase precision inverter
power supply, which has fast testing and high accuracy.
1. The instrument uses a three-phase precision inverter power
supply instead of a single-phase mains power supply as the
measurement voltage, which eliminates the harmonic influence of the
mains voltage during measurement and makes the measurement more
accurate. When the working power source is a generator, it has no
effect.
2. Adopt three-phase output voltage, improve the test speed,
measure the angle between phases, and automatically identify the
transformer wiring group 0-11.
3. It is suitable for a wide variety of transformers, especially
for the measurement of Z-type transformers, rectifier transformers,
ground transformers, electric furnace transformers, phase-shift
transformers, balance transformers, etc. The measurement parameters
are the most comprehensive.
4. The self-made precision three-phase inverter power supply is
adopted, which has high and low voltage reverse connection
protection, transformer inter-turn short circuit protection, tap
switch not in place protection, output full short circuit
protection, and increases the stability of the instrument.
5. After inputting the rated parameters, the transformer ratio,
error value and tap position of the tap changer can be
automatically measured, especially for the tap changer with
asymmetrical taps, the exact position of the transformer tap
changer can also be accurately measured. A tap changer capable of
measuring 99 tap points.
6. Using 7-inch high-definition color touch screen LCD, modular
display, each operation step has Chinese prompts, no need for
manuals, just look at the LCD prompts to complete the instrument
operation.
7. The instrument has both print output, U disk interface, and
RS232 interface, which is convenient for paperless office.
8. It adopts multi-functional engineering plastic box that is
resistant to cold and temperature, is sealed and waterproof, and is
anti-drop and shock-proof, which is convenient for field
experiments.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Panel introduction
(1). Display screen: 7-inch high-definition color touch screen LCD,
digital adjustment backlight, display operation menu and test
results.
(2). High voltage terminal: connect the yellow, green, red and
black terminals of the test line, and connect the three phases a,
B, C and O on the high voltage side of the tested transformer.
(3). Low voltage terminal: yellow, green, red and black are
connected to three phases a, B, C and o at the low voltage side of
the tested transformer
(4). AC220V: power input port of the whole machine, connected to
AC220V power frequency power supply.
(5). protective grounding post.
(6). Communication: serial communication
(7). USB: USB storage
(8). Printer: print test results after measurement.
---------------------------------------------------------------------------------------------------------------------------------------------------------
Test interface
After the instrument is started, the startup interface is displayed
as shown in Figure There are six function options in the startup
interface, including six function options: [three-phase
measurement], [single-phase measurement], [Z-type transformer],
[time setting], [data query] and [system setting]. Click any
function key to enter the setting.
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Three phase measurement interface
Click [three-phase measurement] to enter the three-phase
measurement interface. The text box can pop up the above input
keyboard, and you can enter special values. The standard values can
be changed by pressing the button on the right;
The setting methods of single-phase measurement, Z-type transformer
and three-phase measurement are basically the same and will not be
repeated;
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
The test completion interface is shown in below figure
After the test is completed, press the
[Back] key to return to the startup interface,
[previous] [next] you can view and print historical data;
[U disk] is to store the current data to USB flash disk;
[Print] you can print test data
Test range | 0.9~10000 |
Measurement accuracy | ±0.1%+2 digits (0.9-500) ±0.2%+2 digits (501-2000) ±0.5%+2 words (2001-10000) |
Resolution | 0.0001 minimum |
Output voltage | automatically adjust according to load |
Power supply | AC220V±10% 50±1Hz |
Ambient temperature | -10ºC~40ºC |
Relative humidity | ≤85%, no condensation |
Dimensions | host: 360*290*170(mm) wire box: 360*290*170(mm) |
Weight | host 5.9KG wire box: 5.65KG |
--------------------------------------------------------------------------------------------------------------------------------------------------------------
Packaging: Wooden case filled with foam
Shipping: by Air, Sea, Express, etc.
Shipping time: 7-15 days if it's in stock.
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is
15-20 days if the goods are not in stock,
it is according to quantity.
A: Payment<=1000USD, 100% in advance.
If you have other questions, pls send us an inquiry below:
XI'AN XU&HUI ELECTROMECHANICAL TECHNOLOGY CO.,LTD
Building B8-01, Phase I, Ronghao Industrial City, No. 2098, Weiyang
9th Road, Gaoling District, Xi'an