Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data - powersupplytestsystem

Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

Brand Name:Topfer
Model Number:Top-Smart 1100
Minimum Order Quantity:one set
Delivery Time:2 to 3 weeks
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

The multi-functional power supply testing system, driving power supply testing equipment, and power tester can save test data


Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:

• Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.

• High extensibility, easily integrating standardized interface testers.

• Fast testing speed, 3-4 times faster than traditional ATS systems.

• Open system platform, allowing for self-edited test steps according to requirements.

• Standardized instrument control interface and graphical operating environment (Windows interface).

• The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.


1. Acceptance: Conduct a comprehensive inspection and test of the functions and quality of the high-speed power supply testing system equipment to ensure they are consistent with the contract description. Fill out the project acceptance form and file it in the project archive. Promptly address any issues raised by the customer during the acceptance process. The acceptance is considered qualified only when qualified products are detected and the maximum benefits of the high-speed power supply testing system equipment are maximized.


2. Training: Provide training for the operators and maintenance personnel of the customer's high-speed power supply testing system. The customer's operators can participate in the debugging work of the high-speed power supply testing system. After it is used on-site at the customer's factory, another training will be conducted until the staff can operate and maintain the system normally.


3. Transportation, Installation and Commissioning: Chuangrui will transport the high-speed power supply testing system equipment to the customer's factory for free installation and commissioning. The customer's factory is responsible for assisting in positioning the equipment and providing the power sockets required for the equipment. Chuangrui will be responsible for the installation and commissioning work.


4. Warranty: The high-speed power supply testing system equipment is guaranteed for one year after the customer's commissioning and production. During the warranty period, Chuangrui shall be responsible for the free repair of equipment failures in the high-speed power supply test system. If the system components are damaged due to the design, manufacture or installation of Chuangrui, Chuangrui shall replace the system components free of charge. Accessories will be provided at the most favorable price outside the warranty period.


Test Items for the Switching Power Supply Testing System :

Test itemsTest items
Measuring under LED.ModeTracking
DC Current under C.V.ModeShort circuit test
Peak-Peak noiseShort circuit current
Current peak-Peak noiseOV protection
Voltage peak-Peak noiseUV protection
Transient response timeOL protection
Transient spikeOP protection
Voltage regulationIn-test adjustment
Current regulationAC cycle drop out
Turn ON timePLD simulation
Rise timeGPIB read/write
Fall time232 read/write
Hold-up timeUSB read/write
Inrush current testTTL signal control
Power good signalRelay control
Power fail signalBar code scan
P/S ON signalDynamic test
Power up sequenceSpecification under C.P.Mode
Power off sequenceDC output current
EffciencyDC output voltage
Input RMS currentCurrent Ripple test
Input powerDimming Current
Input power factorDimming frequency
Input voltage rampDimming period
Input freq. ramp

China Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data supplier

Multi Functional Power Supply Testing System Driving Power Supply Testing Equipment Power Tester Can Save Test Data

Inquiry Cart 0