

Add to Cart
ATE Charger Automatic Test System Manufacturer for PD Fast Chargers Comprehensive Testing Equipment
Advantages of the TopFer 1100 Switching Power Supply Automatic Testing System:
• Suitable for testing applications of AC/DC Power Supplies and DC/DC Converters.
• High extensibility, easily integrating standardized interface testers.
• Fast testing speed, 3-4 times faster than traditional ATS systems.
• Open system platform, allowing for self-edited test steps according to requirements.
• Standardized instrument control interface and graphical operating environment (Windows interface).
• The TopFer 6600 switching power supply ATE provides report design and statistical analysis capabilities.
Increasing Automation: With the development of artificial intelligence and machine learning technologies, the automation level of ATE charger automatic testing systems will be further enhanced. The system can automatically identify the type, parameters, and test items of the charger under test, complete the testing process automatically, and generate detailed test reports. This not only improves the testing efficiency but also reduces the impact of human factors on the test results.
Integration and Modularization Trend: In the future, ATE charger automatic testing systems will become more integrated and modular, capable of integrating multiple testing functions into one system to achieve comprehensive testing of chargers. At the same time, the modular design of the system facilitates upgrades and maintenance, allowing enterprises to choose different modules according to their needs, reducing costs and development cycles.
High Precision and High Speed Testing: With the continuous development of charger technology, the requirements for precision and speed of testing systems are also increasing. ATE charger automatic testing systems will continuously improve testing accuracy and be able to measure various parameters of chargers such as voltage, current, and power more accurately. At the same time, the testing speed of the system will also be continuously improved to meet the needs of large-scale production and rapid research and development.
Test Items for the Switching Power Supply Testing System :
Test items | Test items |
Measuring under LED.Mode | Tracking |
DC Current under C.V.Mode | Short circuit test |
Peak-Peak noise | Short circuit current |
Current peak-Peak noise | OV protection |
Voltage peak-Peak noise | UV protection |
Transient response time | OL protection |
Transient spike | OP protection |
Voltage regulation | In-test adjustment |
Current regulation | AC cycle drop out |
Turn ON time | PLD simulation |
Rise time | GPIB read/write |
Fall time | 232 read/write |
Hold-up time | USB read/write |
Inrush current test | TTL signal control |
Power good signal | Relay control |
Power fail signal | Bar code scan |
P/S ON signal | Dynamic test |
Power up sequence | Specification under C.P.Mode |
Power off sequence | DC output current |
Effciency | DC output voltage |
Input RMS current | Current Ripple test |
Input power | Dimming Current |
Input power factor | Dimming frequency |
Input voltage ramp | Dimming period |
Input freq. ramp |