ATE Charger Adapter Power Integrated Automated Test System

Brand Name:Topfer
Model Number:Top-Smart 2000
Minimum Order Quantity:one set
Delivery Time:2 to 3 weeks
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Room 5072, Unit 1, Building 1, No. 2, Nancheng Section, Tiyu Road, Nancheng Street, Dongguan City, Guangdong Province
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

ATE charger adapter test system Power integrated automated test system factory direct sales


Open

• An open hardware platform that allows for the addition or removal of various testing devices according to customer needs (including devices with GPIB, RS-232, USB interfaces, etc.)

• The ATE power supply testing system supports simultaneous testing of multiple single-group/multiple-group output power supplies, significantly increasing production line capacity.

• An open software platform, the ATE power supply testing system can be expanded with new test items and functions based on customer testing requirements.

• The ATE power supply testing system supports simultaneous multi-lane barcode pre-scanning and scanning during testing, enhancing overall testing speed.


Universal

• The ATE power supply testing system supports testing of various power supplies (LED power supplies, adapters/chargers, PC power supplies, inverters, communication power supplies, etc.)

• Complies with ENERGY STAR and IEC 62301 measurement requirements.

• Supports Manufacturing Information System (ShopFloor) interface.

• The ATE power supply testing system supports testing of various power parameters under CV, CC, CR, LED modes.

• Optimizes display mode, allowing for any combination of hardware configurations.


Professional

• The ATE power supply testing system supports complete testing of LED driver power supplies.

• Can accurately read the average current and effective current of the tested LED driver.

• Easily starts low-power LED driver power supplies without pulling down the LED driver due to the high current surge from starting the electronic load.

• The ATE power supply testing system sets realistic LED on-threshold values and post-on operating point resistance through system settings, making the tested current and voltage waveforms very close to real LEDs.

• More realistic high-frequency current waveforms.

• Dimming function test: dimming current, dimming frequency, dimming period (requires additional related hardware devices).


Top-Smart 2000 ATE Power Supply Testing System Test Items:

Test itemsComprehensive Test items
CEC testShort circuit test
DC Current under C.V.ModeShort circuit current
Peak-Peak noiseOV protection
Serial reaction time testUV protection
Transient response timeOL protection
Transient spikeOP protection
TrackingIn-test adjustment test
Voltage regulationAC cycle drop out
Current regulationPLD simulation
Turn ON timeDC output current test
Rise timeDC output voltage test
Fall timeWaveform read test
Hold-up timeInput impulse current test
Inrush current testInput power
Power good signalRelay control
Power fail signalBar code scan
P/S ON signalDynamic test
Power up sequenceSpecification under C.P.Mode
Power off sequenceInput Peak current
Effciency testAdditional expansion measurement test
Overall stability testInput RMS current
Fan Speed testTTL signal control
Input power factorLAN read/write
Input voltage rampRS485 read/write
Input freq. rampUSB read/write
Extend the measurement test232 read/write
Automatic testGPIB read/write

China ATE Charger Adapter Power Integrated Automated Test System supplier

ATE Charger Adapter Power Integrated Automated Test System

Inquiry Cart 0