1100kw 1375kva CNG Generator Set Gas Turbine Generator Set Remote Start

Brand Name:WeiChai
Model Number:WPG
Minimum Order Quantity:1
Delivery Time:30 work days
Payment Terms:T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Address: Building 7, Chengnan Tianfu Wisdom Park, No.76 Industrial Avenue, Pengshan Economic Development Zone, Sichuan
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

High Power 1100kw/1375kva Gas Turbine Generator Set Remote Start


Overview


Advantage

● Environmental protection and energy saving: The use of clean energy, less pollutants in the exhaust gas after combustion, small pollution to the environment, and high combustion efficiency, excellent energy utilization.

● Low operating costs: compared with diesel generators, the gas price is relatively low, and the internal carbon deposit of the equipment is less, and the maintenance cost is also low.

● Good starting performance: from cold start to full load is usually within 30 seconds, can quickly respond to emergency power demand.

Low noise, low vibration: the gas turbine is in a state of high-speed rotation, small vibration, low frequency noise is better than the diesel generator set.

● Good power generation quality: only rotating motion when working, fast electric modulation response, stable output voltage and frequency, small fluctuation.


Application field


● Small and medium-sized power generation projects: wide power range, can meet different scale of power demand.

● Emergency backup power supply: When the power grid is unstable or power failure, it can quickly start power supply to ensure the power supply of important equipment and places.

● Industrial and commercial buildings: such as factories, shopping malls, hotels, etc., can provide power support, but also to achieve cogeneration, improve energy efficiency.

● Special industries: In oil fields and gas fields, associated gas can be used to generate electricity; In landfills and sewage treatment plants, biogas can be used to generate electricity.

Model

WPG1375B(C)7NG

Prime Rating kVA/kWe

1375/1100

Continual Rating kVA/kWe

1375/1100

Voltage V

400/230

Frequency Hz

50

Power Factor

0.8(lagging)

No. of Phases

3

Sound@7m(dB·(A))

Open:≤96 dB(A);Silence:≤85 dB(A)

Ambient temp(°C)

-1040(If -10, oil and water heating; If 40, power correction)

Altitude(m)

≤1500

Fuel

Pipeline natural gas;MN≥85

Gas supply pressure(kPa)

Max. inlet 50 (Special pressure, contact with company)

Steady-state voltage deviation

≤±5%

Transient voltage deviation (100%sudden power decrease/increase)

+35%-25%

Voltage steady time(s)

10

Steady-state frequency band

2.5%

Transient frequency deviation from rated frequency (100% sudden power decrease/increase)

sudden power decrease100%±18%,sudden power increase30%≤-25%

Frequency steady time(s)

10

Standard Features

♦ ECU

♦DC24 Electric starter

♦ WHC9510N

♦ Closed water-cooled

♦ IP23

♦H type insulation

♦ Air filter

♦ Muffler

♦ Circuit Breaker

♦Starting batteries (Maintenance-Free)

♦ Packing case(B)/Wrapping sheet(L)

♦ Radiator

♦Oil Drain Valve

♦Forklift Groove

♦Shock Absorber

♦ Color

Weichai blue (B)/beige canopy and black chassis (L)

♦ Packaging

Options

◇Voltage380V/400V

◇Voltage 415V/440V

◇Voltage 6.3kV/10.5kV /13.8kV

◇Single Voltage 220V/230V/240V

◇Automatic Transfer Switch

◇Automatic Parallel system

◇Engine Heater (water)

Horizontal structure radiator

Alternator heater

◇PMG/AREP


We have cooperation with worldwide famous brands. For more specification,please contact us.
FAQ
1.Q: What is your MOQ of this item?
A:1 Set
2.Q: What is the lead time?
A:7 working days after received the 30%T/T deposit.
3.Q: Is it all right to make customer's own brand name?
A:We can be your OEM manufacture with your authorization of brand.
4.Q: Where is your Loading Port?
A:Shanghai or others.
5.Q: What are your payment terms?
A:30% TT as deposit,70% TT before Shipment.
6.Q: What is your company's available production capacity?
A:100 Sets per month.
7.Q:What's the warranty time of diesel generators?
A:12 months or 1000 working hours, whichever comes first.
China 1100kw 1375kva CNG Generator Set Gas Turbine Generator Set Remote Start supplier

1100kw 1375kva CNG Generator Set Gas Turbine Generator Set Remote Start

Inquiry Cart 0