

Add to Cart
Multifunctional Storage Space Goods Placement For Steel Structure
Warehouse
Product Advantages
1.Short construction period and fast production: For projects of
the same scale, the construction period of steel structures is
40%-60% shorter than that of concrete.
2.Less affected by climate: Concrete construction is afraid of
rain, snow and low temperatures (insulation and maintenance is
required in winter), and steel structure assembly is mostly dry
work. Construction can be carried out normally in rainy days and
winter, reducing the risk of delay in the construction period.
Product Attributes
| Remark | |
Brace | ordinary, high strength bolt | |
Main frame | H beam | |
Roof &wall | EPS,Rock wool , PU sandwich | |
Insulation panel | EPS,Rock wool , PU sandwich | |
Purlin | C or H section steel purlin | |
Door | Sliding or rolling door | |
Sheet | 0.2mm-0.6mm galvanzied steel sheet | |
Material | Q235B,Q355B China standard steel |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1.Warehousing and logistics centers: such as e-commerce warehouses
and cold chain logistics parks. The steel structure can realize a
large-span (20-30m) pillar-free space, which is convenient for
forklifts and AGV robots to operate efficiently; at the same time,
the steel structure roof has light weight (about 1/3 of that of the
concrete roof), which can reduce the basic cost, and the
construction cycle is short (more than 40% faster than the concrete
structure), which can quickly meet the production needs of
logistics and warehousing.
2. Public buildings (such as venues and transportation hubs) often
require large-span spaces and unique architectural shapes. At the
same time, they need to cope with the earthquake and fire
prevention needs of dense people. Steel structures are the core
solution to achieve these goals.
3.Sports venues: such as gymnasiums (basketball halls, badminton
halls), stadiums (football fields), swimming pools. Typical cases
such as the Beijing Olympic Games "Bird's Nest"(National Stadium)
use complex spatial truss steel structures to achieve a columnless
stand with a span of 343 meters. At the same time, the unique
"Bird's Nest" shape has become a city landmark; swimming pools
(such as the National Aquatics Center "Water Cube") The steel
structure support system can adapt to the curved roof and has light
weight, reducing the pressure on the foundation.
Picture
Company Introduction
China CT Steel Structure Co., Ltd is a comprehensive industrial
group that integrates steel structure research and development,
design, manufacturing, production, and installation. Since its
establishment in 2004, it coversan area of approximately 300000
square meters and produces 200000 tons of steel structures
annually. We have over 500 well-trained employees, more than 100
professional design teams, after-sales service teams, and many
advanced equipment.
The company has 30 steel structure production lines, specializing
in the design, manufacturing, and installation of industrial and
civil buildings such as steel structure factories, warehouses,
high-rise steel structure buildings, office buildings,
exhibition,halls, sports halls, parking garages, prefabricated
houses, and agricultural projects. We are committed to providing
customers with innovative solutions that not only meet their
expectations, but also exceed them.
Why choose us?
+1. We have 21 years of industry experience.
+2.Professional design team with an annual output of 400,000 tons
to meet customer needs.
+3.Savings: Buying directly from our factory saves at least 30%-40%
compared to buying from the local market.
+4.24-hour online service, 100% quality assurance, once a quality
problem occurs, it will be fully solved for you immediately.
Certifications
Transport
FAQ