1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Brand Name:XCMG
Model Number:XLC220
Minimum Order Quantity:One Crane
Delivery Time:According to Order Confirmation
Payment Terms:L/C,T/T
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Zibo Shandong China
Address: Steel Market in Huantai County, Zibo City, Shandong Province, China
Supplier`s last login times: within 21 hours
Product Details Company Profile
Product Details

220T Crawler Crane Can Play A Key Role In Heavy Machinery Handling And Improve Production Efficiency

XLC220 Crawler Crane Technical Specifications


Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m


Typical working conditions


Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook


Operating radius(m)


Main boom length(m)

17

20

23

26

29

32

35

38

41

44

47

50

5

220.0












6

196.0

192.0

190.5

179.0









7

177.0

176.0

174.5

173.5

167.0

156.0

144.0






8

154.5

154.0

153.5

151.9

147.3

144.7

138.2

127.0

115.0

103.0



9

136.0

136.0

135.2

133.4

131.0

127.0

124.0

121.0

109.0

103.0

101.0


10

115.0

115.0

116.0

116.0

115.0

112.0

110.0

107.0

105.0

102.0

99.0

91.0

12

87.5

87.9

88.2

88.3

88.4

88.4

88.4

87.2

85.5

83.8

82.2

80.6

14

69.7

70.2

70.5

70.6

70.7

70.7

70.6

70.6

70.5

70.3

69.1

67.8

16

57.4

58.0

58.3

58.4

58.5

58.5

58.4

58.3

58.3

58.1

58.0

57.9

18


49.0

49.3

49.5

49.6

49.5

49.5

49.4

49.3

49.2

49.1

48.9

20



42.5

42.6

42.7

42.7

42.7

42.6

42.5

42.4

42.2

42.1

22




37.2

37.4

37.3

37.3

37.2

37.1

37.0

36.9

36.7

24




32.8

33.0

33.0

33.0

32.9

32.8

32.6

32.5

32.3

26





29.3

29.4

29.4

29.3

29.2

29.1

28.9

28.7

28






26.3

26.3

26.2

26.2

26.0

25.9

25.7

30







23.7

23.7

23.6

23.5

23.3

23.1

32







21.5

21.4

21.4

21.2

21.1

20.9

34








19.5

19.4

19.3

19.2

19.0

36









17.7

17.6

17.4

17.3

38










16.0

15.9

15.8

40










14.7

14.6

14.4

42











13.3

13.2

44












12.1

Magnification

18

18

16

14

13

12

11

10

9

9

8

8


Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook

Operating radius(m)

Main boom length(m)

53

56

59

62

65

68

71*

74*

77*

80*

83*

10

85.4

81.5

78.5

68.5








12

79.4

77.9

76.4

66.5

65.5

62.6

60.2

55.0




14

67.0

65.8

64.6

63.5

62.3

60.5

58.5

53.5

48.8

44.6

40.8

16

57.6

56.6

55.7

54.7

53.8

53.0

52.0

51.3

47.4

43.3

39.7

18

49.1

48.9

48.7

47.8

47.0

46.4

45.5

44.9

44.1

42.1

38.5

20

42.2

42.1

41.9

41.7

41.5

41.0

40.2

39.8

39.0

38.5

37.4

22

36.8

36.7

36.5

36.3

36.1

36.0

35.8

35.4

34.8

34.3

33.7

24

32.5

32.3

32.1

31.9

31.7

31.7

31.4

31.4

31.2

30.8

30.2

26

28.9

28.7

28.5

28.3

28.1

28.0

27.8

27.8

27.5

27.4

27.2

28

25.9

25.7

25.5

25.3

25.1

25.0

24.7

24.7

24.5

24.4

24.1

30

23.3

23.1

22.9

22.7

22.5

22.4

22.2

22.1

21.9

21.8

21.5

32

21.1

20.9

20.7

20.5

20.3

20.2

19.9

19.9

19.7

19.6

19.3

34

19.1

19.0

18.8

18.6

18.4

18.3

18.0

18.0

17.7

17.6

17.4

36

17.4

17.3

17.1

16.9

16.7

16.6

16.3

16.3

16.0

15.9

15.7

38

15.9

15.8

15.6

15.4

15.1

15.0

14.8

14.8

14.5

14.4

14.2

40

14.6

14.4

14.2

14.0

13.8

13.7

13.4

13.4

13.2

13.0

12.8

42

13.4

13.2

13.0

12.8

12.6

12.5

12.2

12.2

12.0

11.8

11.6

44

12.3

12.1

11.9

11.7

11.5

11.4

11.1

11.1

10.9

10.7

10.5

46

11.2

11.1

10.9

10.7

10.5

10.4

10.1

10.1

9.9

9.8

9.5

48


10.2

10.0

9.8

9.6

9.5

9.2

9.2

9.0

8.8

8.6

50


9.3

9.2

9.0

8.8

8.7

8.4

8.4

8.1

8.0

7.8

52



8.4

8.2

8.0

7.9

7.6

7.6

7.4

7.3

7.0

54




7.5

7.3

7.2

6.9

6.9

6.7

6.6

6.3

56





6.6

6.5

6.3

6.3

6.0

5.9

5.7

58





6.0

5.9

5.7

5.7

5.4

5.3

5.1

60






5.3

5.1

5.1

4.9

4.7

4.5

62







4.6

4.6

4.3

4.2

4.0

64








4.1

3.8

3.7

3.5

66








3.6

3.4

3.3

3.0

68









2.9

2.8

2.6

70










2.4

2.2

Magnification

7

6

6

6

5

5

5

4

4

4

4


Notes:

1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.

2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.


China 1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency supplier

1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency

Inquiry Cart 0