Prefabricated Building Metal Sandwich Panel Construction Material EPS Sandwich Panel

Brand Name:Lanjing
Certification:CE, ISO, SGS
Model Number:LJ-P01
Minimum Order Quantity:100 square meters
Delivery Time:15-20 working days
Payment Terms:,L/C,T/T,D/P
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Hisense Ring Bay Mansion 12B08, Ruichang Road No. 226, Shibei District, Qingdao, Shandong, China
Supplier`s last login times: within 13 hours
Product Details Company Profile
Product Details

Prefabricated Building Metal Sandwich Panel Metal Construction Building Materials EPS Sandwich Panel

Product Description


EPS Sandwich Panel



Thickness
50/75/100/120/150(mm)
Effective width
950, 980, 1150(mm)
Length
less than 11.8m.
Materials
Polystyrene foam board
Density
8-20 kg/m³
Color
White, sea blue, red etc.
Character
Light weight, heat insulation, water resistant
Usage
Roof, Wall

Rockwool Sandwich Panel



Painting of steel plates
PVDF, SMP, HDP, PE;
Galvanized layer of steel plates
Exterior plate: Zinc coating above 150g/m2;
Inner plate: Zinc coating above 100g/m2.
Thickness of steel plates
0.4mm-0.8mm.
Thickness of core
50/75/100/120/150mm.
Density of core
60/80/100/120kg/m³
Effective width
950/1150mm
Panel Length
Any length

PU Sandwich Panel


RP-930/1000 TypeApplication
Effective width(mm)930/1000

Roof panel
Thickness of plate(mm)0.4-0.8
Thickness of core material(mm)40/50/100/150mm
Core materialPU/PIR
WP-930/1000TypeApplication
Effective width(mm)930/1000Wall panel
Thickness of plate(mm)0.4-0.8
Thickness of core material(mm)40/50/100/150/200mm
Core materialPU/PIR

1. Roof sandwich panel



2. Wall sandwich panel



3.Cold room sandwich panel



Sandwich Panel Performance


Packing&Delivery



Sandwich Panel Project Cases


FAQ


Q1: Do you have an advantage in price?

A: Yes, as a leading sandwich panel manufacturer in China, we benefit from long-term partnerships with raw material suppliers, ensuring cost-effective pricing. Our skilled labor also contributes to our competitive advantage, providing high-quality products at better prices.

Q2. What are your terms of payment?

A: Our standard payment terms are T/T 30% as a deposit, with the remaining 70% due before delivery. We will provide you with detailed photos of the products and packaging before the final payment.

Q3. How about your delivery time?

A: Generally, our delivery time is 20-30 days after receiving your advance payment. This timeframe may vary depending on the specific items and the quantity of your order.

China Prefabricated Building Metal Sandwich Panel Construction Material EPS Sandwich Panel supplier

Prefabricated Building Metal Sandwich Panel Construction Material EPS Sandwich Panel

Inquiry Cart 0