Product Details
Aplly to relese the induced current on the line for stringing
construction.
During power line construction, especially during tension stringing
operations, static electricity can be generated during the
deployment of conductors or ground wires due to friction and other
factors, accumulating a large amount of charge. Grounding roller
stringing pulleys can quickly and effectively conduct these induced
charges to the ground, preventing charge accumulation on the
conductors and avoiding safety accidents caused by static
electricity, such as electric shocks to workers and electrical
equipment failures.
| ltem No. | Model | Outside Diameter Of Sheave | Sheaves | ltem No. | Model | Outside Diameter Of Sheave | Sheaves |
| NET162/1 | SHDN508D | Φ508x75 (508*100) | 1 | NET164/1 | SHDN822D | Φ822x110 | 1 |
| NET162/3 | SHDN508D | 3 | NET164/3 | SHDN822D | 3 |
| NET162/5 | SHDN508D | 5 | NET164/5 | SHWN660D | 5 |
| NET163/1 | SHDN660D | Φ660x100 (660*110) | 1 | NET165/1 | SHDN916D | Φ916x110 | 1 |
| NET163/3 | SHDN660D | 3 | NET165/3 | SHDN916D | 3 |
| NET163/5 | SHDN660D | 5 | NET165/5 | SHDN916D | 5 |
Company Profile
Jiangsu Net power equipment technology co., ltd. now the plant is
located in Jiulong Industrial Park, Jiangsu, Taizhou
City,convenient transportation, convenient communication. The
company Production equipment, advanced detectionmeans, has strong
power equipment development and production capacity.Special
construction and maintenance machinery company is mainly applicable
to the production of power transmissionand transformation project,
including the foundation construction, tower erection, put the line
cable, electric Cablelaying, live line work and the safety
equipment, electric power fittings, shock absorber, the whole
series, many varietiesmarketing the country 29 provinces, city,
autonomous region More than 5000 power companies and
telecomenterprises, and exported to Southeast Asia and North
America etc..
A lot of money every year, used to update the new product
development and product, dozens of experts, engineers
from all over the country, in order to improve China's
transportation The mechanization level of power transmission line
construction, to ensure the quality of our country various
large-scale transmission line construction projectdevoted all their
wisdom and sweat,To develop science and technology content
increased, better products to meetcustomer needs.