2.8 Inch TFT LCD SPI MIMP JD9852 Lower Power LCD Dot Matrix Display

Brand Name:ESEN
Certification:ISO9001/ISO14001
Model Number:T-280HX3301
Minimum Order Quantity:No MOQ
Delivery Time:6~14 working days
Payment Terms:L/C,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen China
Address: Unit 901B, 9th Floor, Block D, Cai Fu Gang International Building, Bao Yuan Road, Bao An District, Shenzhen,China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

2.8inch SPI MIMP JD9852 Lower Power Lcd Dot Matrix Display TFT LCD Display

DC Characteristics

Typical Operation Conditions

Backlight Circuit Characteristics

Q&A
1. Question:Are you a manufacturing company or a trading company?
Answer:We are a manufacturing company with factories located in Shenzhen, Dongguan, and Jiangxi.

2. Question: How can we obtain the samples?
Answer:The process for obtaining samples is as follows: Send an inquiry → Receive a quotation → Confirm the quotation and pay the mold fee → Provide technical drawings → Confirm the drawings → Manufacture the mold and produce samples → Complete the samples → Deliver via freight or sea transportation.

3. Question:How long will it take to receive the samples?
Answer: Wireframe drawing preparation takes 2-3 business days. Sample production time is approximately 10-15 business days.

4. Question: Will you provide free samples?
Answer:Yes, we typically provide 1-3 free samples per order. However, the mold fee must be covered by the client.

5. Question: Can you design LCD displays according to our specifications?
Answer:Absolutely. We specialize in custom designs and offer competitive mold fees tailored to your requirements.

6. Question:What is the process for placing an order?
Answer: Once the samples have been approved, please submit your official purchase order via email or fax. Upon receipt, we will issue an invoice for the deposit. To proceed, we require the following details regarding your order:
1) Product information: quantity and part numbers
2) Delivery schedule preferences
3) Logistics information: company name, address, postal code, phone and fax numbers, and destination port
4) If applicable, please provide contact details for your freight forwarder in China.

7. Question: How long does mass production take?
Answer:Mass production typically requires 25-30 business days. This timeline may vary depending on the specific order quantities and part numbers.

China 2.8 Inch TFT LCD SPI MIMP JD9852 Lower Power LCD Dot Matrix Display supplier

2.8 Inch TFT LCD SPI MIMP JD9852 Lower Power LCD Dot Matrix Display

Inquiry Cart 0