Construction Equipment Modular Panel Bridges Compact TSR Structure

Brand Name:Zhonghai Bailey Bridge
Certification:IS09001, CE
Model Number:CB200/CB321
Minimum Order Quantity:1 Pcs
Delivery Time:8-10 work days
Payment Terms:L/C,D/P,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhenjiang Jiangsu China
Address: No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Construction Equipment Modular Panel Bridges/compact Panel Bridge


Construction time of Type 321 Bailey bridge in military operations

The construction time of Type 321 Bailey bridge in military operations varies depending on the span, complexity and proficiency of the bridge operators. Here are some specific cases and data:


1. **Actual case**
- On July 6, 2016, the bridge squadron of the Sixth Brigade of the Armed Police Traffic Brigade built a Bailey bridge in Dingjiazhai Village, Yanjiahe Town, Macheng City to rescue more than 800 villagers trapped in Yejia Village on the opposite bank. The bridge is nearly 200 meters long. One of the damaged and collapsed parts is close to the embankment abutment of Yanjiahe Town, with a length of more than 30 meters; the other is located in the middle of the bridge, close to Yejia Village, with a length of about 40 meters. The officers and soldiers of the Armed Police Traffic Force worked continuously day and night, and finally completed the construction of the bridge in 18 hours and 35 minutes.

- In November 2015 and September 2016, the Lishui Highway Administration Bureau conducted emergency erection and dismantling drills for the 321-type Bailey bridge in response to landslide geological disasters. In one drill, the rescue team successfully erected a 321-type Bailey bridge with a single span of 12 meters and a width of 3.75 meters in just one and a half hours.


2. **Theoretical data**
- According to the user manual of the 321-type Bailey bridge, the assembly and laying of the bridge are very convenient and the bridge can be built in a short time.
- In general, the construction time of the 321-type Bailey bridge depends on the span and complexity of the bridge. For a bridge with a single span of about 30 meters, skilled operators can usually complete the construction within 6 to 12 hours.


Summary
The construction time of the Type 321 Bailey Bridge in military operations usually ranges from a few hours to a day, depending on the span, complexity and proficiency of the bridge operators. Its rapid construction and disassembly features make it an ideal choice for emergency situations.



Specifications:

CB321(100) Truss Press Limited Table
No.Lnternal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No.Geometric CharacteristicsStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2

​​

CB200 Truss Press Limited Table
NO.Internal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSQSSSRDSRTSRQSR
200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
202High Bending Truss Shear(kN)3486961044139234869610441392
203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
StructureGeometric Characteristics
Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
ssSS25.485437580174
SSR50.96108751160348
DSDS50.96108751160348
DSR176.44163121740522
DSR2101.92217502320696
TSTS76.44163121740522
TSR2127.4271852900870
TSR3152.88326253481044
QSQS101.92217502320696
QSR3178.36380594061218
QSR4203.84435004641392



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



China Construction Equipment Modular Panel Bridges Compact TSR Structure supplier

Construction Equipment Modular Panel Bridges Compact TSR Structure

Inquiry Cart 0