Constrcution Steel Bridge Temporary Steel Truss Bridge Steel Deck / Concrete Deck

Brand Name:Zhonghai Bailey Bridge
Certification:IS09001, CE
Model Number:CB200/CB321
Minimum Order Quantity:1 Pcs
Delivery Time:8-10 work days
Payment Terms:L/C,D/P,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhenjiang Jiangsu China
Address: No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Constrcution Steel Bridge/steel Panel Bridge


Bailey bridges have been used in environmentally sensitive areas to demonstrate their advantages in terms of rapid deployment, minimal environmental impact and strong adaptability. Here are some specific examples:


1. Emergency response after the Nepal earthquake (2015)
After the 2015 Nepal earthquake, Bailey bridges were quickly deployed to connect mountain villages isolated by the earthquake, ensuring that relief supplies and medical assistance could arrive in time. Its rapid assembly capability enabled relief organizations to restore critical transportation networks in a short period of time, significantly alleviating the suffering in the affected areas.


2. Flood response in Southeast Asia
In areas such as Bangladesh, Vietnam and the Philippines, frequent floods often damage bridges and lead to the isolation of communities. Bailey bridges provide a rapid alternative to ensure the continued distribution of relief supplies and evacuation routes for residents. Its tolerance to adverse weather conditions makes it play an important role in supporting the long-term recovery of vulnerable communities.


3. Reconstruction after the Haiti Earthquake (2010)
After the 2010 Haiti earthquake, Bailey bridges were critical in restoring connectivity, allowing reconstruction materials, medical aid, and essential supplies to be efficiently transported. Their rapid installation capabilities significantly contributed to Haiti’s infrastructure reconstruction and long-term economic recovery.


4. Eco-Sensitive Areas in Karnataka, India
In the Dakshina Kannada region of Karnataka, India, ecologically sensitive areas were identified using a combination of indicators. Bailey bridges were used in these areas to minimize impact on local ecosystems while providing necessary transport connectivity.


5. Rural Transport Improvement Project in Papua New Guinea
In the Central and West New Britain provinces of Papua New Guinea, Bailey bridges are being used to improve transport connectivity in rural areas. The project involves the replacement of 18 bridges, including Bailey and steel truss bridges. The use of Bailey bridges not only improves transport efficiency, but also reduces environmental impact.


Summary of Environmental Advantages
The application of Bailey bridges in environmentally sensitive areas demonstrates its significant environmental advantages:
- **Minimized land disturbance**: Bailey bridge installation generally requires less site preparation and foundation work, reducing disturbance to surrounding ecosystems.
- **Temporary deployment**: Bailey bridges are removable and repositionable so that they do not cause permanent changes to the landscape, reducing long-term environmental impacts.
- **Ecosystem protection**: With careful planning, Bailey bridges can protect local ecosystems and reduce habitat disturbance.
- **Resource efficiency**: Bailey bridges use materials (such as steel) that are durable and recyclable, reducing the need for new resources.

These cases and advantages show that Bailey bridges not only excel in emergency response and temporary transportation solutions, but also provide sustainable solutions in environmentally sensitive areas.



Specifications:

CB321(100) Truss Press Limited Table
No.Lnternal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No.Geometric CharacteristicsStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2

​​

CB200 Truss Press Limited Table
NO.Internal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSQSSSRDSRTSRQSR
200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
202High Bending Truss Shear(kN)3486961044139234869610441392
203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
StructureGeometric Characteristics
Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
ssSS25.485437580174
SSR50.96108751160348
DSDS50.96108751160348
DSR176.44163121740522
DSR2101.92217502320696
TSTS76.44163121740522
TSR2127.4271852900870
TSR3152.88326253481044
QSQS101.92217502320696
QSR3178.36380594061218
QSR4203.84435004641392


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



China Constrcution Steel Bridge Temporary Steel Truss Bridge Steel Deck / Concrete Deck supplier

Constrcution Steel Bridge Temporary Steel Truss Bridge Steel Deck / Concrete Deck

Inquiry Cart 0