Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

Brand Name:Zhonghai Bailey Bridge
Certification:IS09001, CE
Model Number:CB200/CB321
Minimum Order Quantity:1 Pcs
Delivery Time:8-10 work days
Payment Terms:L/C,D/P,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhenjiang Jiangsu China
Address: No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Suspension Bailey Bridge/prefabricated Compact Bailey Bridge


When reinforcing Bailey bridges in mountainous areas, construction safety is of vital importance. Here are some key safety considerations and measures:


1. **Preparation before construction**
- **Geological survey**: Before construction, a detailed survey of the geological conditions in the mountainous area should be conducted to ensure the rationality of the foundation treatment plan.
- **Special construction plan**: Prepare a special construction plan including design, assembly, dismantling, etc., and clarify safety measures.
- **Staff training**: All personnel involved in the construction must be qualified after training before they can take up their posts, and special operations personnel must be certified before taking up their posts.


2. **Foundation treatment**
- **Foundation bearing capacity inspection**: After the foundation is excavated, it should be checked whether the geology meets the design requirements, the concrete foundation should be poured in time, and drainage facilities should be well prepared to avoid rainwater soaking.
- **Foundation reinforcement**: According to the geological conditions, pile foundation reinforcement or foundation treatment (such as replacement filling, grouting reinforcement, etc.) is used to enhance the bearing capacity and stability of the foundation.


3. **Safety measures during construction**
- **Construction equipment management**: The machinery, equipment, materials, etc. used should comply with national and industry standards to ensure the safety of the equipment.
- **Protection of construction personnel**: Construction personnel must wear personal protective equipment such as safety helmets and safety belts, and it is strictly forbidden to work under the influence of alcohol.
- **Lifting operation**: When lifting Bailey piers, they should be assembled in layers to avoid lifting a single set of Baileys to the top at one time, and ensure that the connection is firm before proceeding to the next step.
- **Scaffolding and protective facilities**: The erected scaffolding must be firm and reliable, and protective nets should be installed around and below to prevent people and objects from falling.
- **Electrical safety**: Temporary electricity use at the construction site should be strictly implemented in accordance with relevant specifications, use safe voltage, and ensure safe electricity use.


4. **Inspection and maintenance after construction**
- **Inspection and acceptance**: After the construction is completed, the connection of each part should be inspected and accepted to ensure the quality of construction.
- **Regular maintenance**: After the reinforcement is completed, the bridge should be inspected and maintained regularly to promptly discover and deal with potential safety hazards.

Through the above measures, construction safety can be effectively guaranteed during the reinforcement construction of Bailey bridges in mountainous areas, ensuring the stability and safety of the bridges.



Specifications:

CB200 Truss Press Limited Table
NO.Internal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSQSSSRDSRTSRQSR
200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
202High Bending Truss Shear(kN)3486961044139234869610441392
203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
StructureGeometric Characteristics
Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
ssSS25.485437580174
SSR50.96108751160348
DSDS50.96108751160348
DSR176.44163121740522
DSR2101.92217502320696
TSTS76.44163121740522
TSR2127.4271852900870
TSR3152.88326253481044
QSQS101.92217502320696
QSR3178.36380594061218
QSR4203.84435004641392

​​

CB321(100) Truss Press Limited Table
No.Lnternal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No.Geometric CharacteristicsStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2



Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



China Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge supplier

Q235 Bailey Suspension Bridge / Prefabricated Compact Bailey Bridge

Inquiry Cart 0