Galvanization Or Painting Steel Frame Bridge Portable Prefab Steel Bridges 10-60 Meters Span Length

Brand Name:Zhonghai Bailey Bridge
Certification:IS09001, CE
Model Number:CB200/CB321
Minimum Order Quantity:1 Pcs
Delivery Time:8-10 work days
Payment Terms:L/C,D/P,T/T
Contact Now

Add to Cart

Verified Supplier
Location: Zhenjiang Jiangsu China
Address: No. 83, Dantu New City Section, Speech Highway, Dantu District, Zhenjiang, Jiangsu, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Steel Frame Bridge For Sale/steel Portable Bridge For Sale


Zinc-rich primer coatings work to prevent corrosion in steel bridges through a combination of mechanisms that provide both physical and electrochemical protection:


1. **Cathodic Protection**
Zinc-rich primers contain a high concentration of zinc particles (typically 60-90%), which act as sacrificial anodes. Zinc is more electrochemically active than iron, so it corrodes preferentially when exposed to moisture and air. This sacrificial corrosion of zinc forms a protective layer of zinc oxide, which prevents the underlying steel from corroding.


2. **Barrier Protection**
The epoxy resin in zinc-rich primers forms a tight, impermeable barrier over the steel surface. This barrier physically blocks water, oxygen, and other corrosive elements from reaching the steel, significantly reducing the risk of rust and corrosion.


3. **Passivation of Steel Surface**
The zinc oxide layer formed during the corrosion of zinc can create a passive film on the steel surface. This film further inhibits the progress of rust formation by reducing the rate of iron dissolution.


4. **Reduced Oxygen Availability**
The combination of the tightly bonded epoxy layer and the zinc oxide formation limits the availability of oxygen at the metal surface. Since oxygen is a key component in the corrosion process, reducing its availability helps to slow down or prevent rusting.


5. **Chemical Protection**
The epoxy resin component in zinc-rich primers provides additional chemical resistance, protecting the steel from reactions with other corrosive chemicals.


Conclusion
Zinc-rich primer coatings protect steel bridges from corrosion through a dual mechanism of cathodic protection and barrier protection. The high zinc content ensures that the coating acts as a sacrificial anode, while the epoxy resin creates a durable barrier against environmental factors. This combination extends the lifespan of steel structures, reduces maintenance needs, and enhances overall durability.


Specifications:

CB321(100) Truss Press Limited Table
No.Lnternal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Standard Truss Moment(kN.m)788.21576.42246.43265.41687.533754809.46750
321(100)Standard Truss Shear (kN)245.2490.5698.9490.5245.2490.5698.9490.5
321 (100) Table of geometric characteristics of truss bridge(Half bridge)
Type No.Geometric CharacteristicsStructure Form
Not Reinforced ModelReinforced Model
SSDSTSDDRSSRDSRTSRDDR
321(100)Section properties(cm3)3578.57157.110735.614817.97699.115398.323097.430641.7
321(100)Moment of inertia(cm4)250497.2500994.4751491.62148588.8577434.41154868.81732303.24596255.2

​​

CB200 Truss Press Limited Table
NO.Internal ForceStructure Form
Not Reinforced ModelReinforced Model
SSDSTSQSSSRDSRTSRQSR
200Standard Truss Moment(kN.m)1034.32027.22978.83930.32165.44244.26236.48228.6
200Standard Truss Shear (kN)222.1435.3639.6843.9222.1435.3639.6843.9
201High Bending Truss Moment(kN.m)1593.23122.84585.56054.33335.86538.29607.112676.1
202High Bending Truss Shear(kN)3486961044139234869610441392
203Shear Force of Super High Shear Truss(kN)509.8999.21468.21937.2509.8999.21468.21937.2

​​

CB200 Table of Geometric Characteristics of Truss Bridge(Half Bridge)
StructureGeometric Characteristics
Geometric CharacteristicsChord Area(cm2)Section Properties(cm3)Moment of Inertia(cm4)
ssSS25.485437580174
SSR50.96108751160348
DSDS50.96108751160348
DSR176.44163121740522
DSR2101.92217502320696
TSTS76.44163121740522
TSR2127.4271852900870
TSR3152.88326253481044
QSQS101.92217502320696
QSR3178.36380594061218
QSR4203.84435004641392


Advantage

Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity



China Galvanization Or Painting Steel Frame Bridge Portable Prefab Steel Bridges 10-60 Meters Span Length supplier

Galvanization Or Painting Steel Frame Bridge Portable Prefab Steel Bridges 10-60 Meters Span Length

Inquiry Cart 0