Product Details
CET-2001Q
Epoxy Resin Grout for Quartz Sensors
CET-200Q is 3-component modified epoxy grout (A: resin, B: curing
agent, C: filler) specifically designed for the installation and
anchoring of dynamic weighing quartz sensors (WIM sensors). Its
purpose is to fill the gap between the concrete base groove and the
sensor, providing stable support to ensure long-term stable
operation of the sensor and extend its service life.
Product Composition and Mixing Ratio
Components:
- Component A: Modified epoxy resin (2.4 kg/barrel)
- Component B: Curing agent (0.9 kg/barrel)
- Component C: Filler (16.7 kg/barrel)
Mixing Ratio: A:B:C = 1:0.33:(5-7) (by weight), pre-packaged total weight of 20
kg/set.
Technical Parameters
Item | Specification |
Curing Time (23℃) | Working time: 20-30 minutes; Initial setting: 6-8 hours; Fully
cured: 7 days |
Compressive Strength | ≥40 MPa (28 days, 23℃) |
Flexural Strength | ≥16 MPa (28 days, 23℃) |
Bond Strength | ≥4.5 MPa (with C45 concrete, 28 days) |
Applicable Temperature | 0℃~35℃ (not recommended above 40℃) |
Construction Preparation
Base Groove Dimensions:
- Width ≥ Sensor width + 10mm;
- Depth ≥ Sensor height + 15mm.
Base Groove Treatment:
- Remove dust and debris (use compressed air to clean);
- Wipe the groove surface to ensure dryness and oil-free conditions;
- The groove must be free of standing water or moisture.
Mixing and Construction Steps
Mixing the Grout:
- Mix components A and B with an electric drill mixer for 1-2 minutes
until uniform.
- Add component C and continue mixing for 3 minutes until no granules
remain.
- Working Time: The mixed grout must be poured within 15 minutes.
Pouring and Installation:
- Pour the grout into the base groove, filling slightly above the
sensor level;
- Ensure the sensor is centered, with grout evenly extruded on all
sides;
- For gap repairs, the grout height should be slightly above the base
surface.
Temperature and Mixing Ratio Adjustments
Ambient Temperature | Recommended Usage (kg/batch) |
<10℃ | 3.0~3.3 |
10℃~15℃ | 2.8~3.0 |
15℃~25℃ | 2.4~2.8 |
25℃~35℃ | 1.3~2.3 |
Note:
- At low temperatures (<10℃), store the materials in a 23℃ environment for 24 hours before use;
- At high temperatures (>30℃), pour in small batches quickly.
Curing and Traffic Opening
- Curing Conditions: The surface drying occurs after 24 hours, allowing sanding; full
curing takes 7 days.
- Traffic Opening Time: The grout can be used 24 hours after curing (when surface
temperature ≥20℃).
Company Profile
Enviko
was founded in 2011, headquarter office in Hong Kong, factory
located in Guangzhou & Chengdu. In 2021, we established China
division in Chengdu, further enhancing our influence and service
capabilities in the Asian market. We are specialized in the fields
of intelligent transportation systems, smart grid systems, and
civil bridge safety systems. With over ten years of experience in
research, develop, and service, we are dedicated to providing the
highest quality products and services to our global customers.
Two brands: Enviko and Viimax series.
Enviko represents our mature and stable products, dedicated to
providing reliable and high-quality solutions. The Viimax series
represents our innovative and pioneering products, constantly
pushing the boundaries of technology and driving industry
innovation. This dualbrand strategy allows Enviko to maintain a
leading position in a highly competitive market.
Enviko is committed to providing high-quality products and
services, working sincerely with partners and customers to achieve
mutual growth. We will continue to pursue this strategy, constantly
striving for technological innovation and industry advancement.
Enviko looks forward to working with you to create a better future.