160KVA 10KV Oil Filled Distribution Transformers 3 Phase Sealed Construction Dyn11 Yyn0

Contact Now

Add to Cart

Verified Supplier
Location: Changsha Hunan China
Address: Room905, D6 building, CCSP Industrial Park, Yuelu District, Changsha,Hunan province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details
160KVA 10KV Oil Filled Distribution Transformers 3 Phase Sealed Construction Dyn11 Yyn0
Product Overview

HENTG Power 160KVA 10KV Oil-filled Three-phase Distribution Transformer features sealed construction and high-density pressboard insulation for superior dust and moisture resistance, ensuring reliable performance in extreme climates.

Key Specifications
AttributeValue
Frequency50Hz, 60Hz, 50/60Hz
ApplicationDistribution system
Coil StructureLayer coil
Output Voltage440V
Input Voltage10kV
TypeOil-Immersed Transformer
Rated Capacity200-700kva
Cooling MethodOil Cooling
Vector GroupDyn11 / Yyn0
Key Benefits
  • High Voltage Level Design with rated voltage of 35KV, suitable for medium voltage distribution networks
  • Ensures stable power supply for urban and industrial park applications
  • Wide applicability compatible with various power systems
  • S20 type energy-efficient secondary oil-immersed transformer
Why Choose HENTG Power?
  • Professional 30+ senior engineers offer 24 hours online service with response within 30 minutes
  • 100,000m² factory with 250+ workers, 30+ senior engineers and 8 production lines
  • 20,000+ sets annual production capacity
  • 100% OQC testing with 8 main detection contents
  • 15+ years power transformer designing and manufacturing experience
  • Complies with GB 20052-2024/ANSI/IEEE/DOE2016/CSA/IEC60076 standards
  • Cross-industry power transformer solutions
  • Global on-site technical support
Core Competencies
  • Precision Manufacturing: Oil/Dry-Type Transformers (500kV/480MVA), GIS, Switchgear
  • Standards Mastery: DOE2016 / IEC60076 / IEEE / CSA / ANSI
  • Quality Protocol: Stage 1: Prototype Validation → Stage 2: FAT Certification → Stage 3: Lifetime Support (2+ Years)
Why We Lead
  • 30+ Senior Engineers for on-demand technical escalation
  • 7-Day Drawing Finalization Cycle
  • Global OEM Project Support
China 160KVA 10KV Oil Filled Distribution Transformers 3 Phase Sealed Construction Dyn11 Yyn0 supplier

160KVA 10KV Oil Filled Distribution Transformers 3 Phase Sealed Construction Dyn11 Yyn0

Inquiry Cart 0