

Add to Cart
Multi Storey Prefab Steel Structure Office Building With EPS Big Wave Tile Roof
Product Description:
Under the proposition of sustainable development, steel-structure office buildings highlight the "green" gene. Steel's 100% recyclability makes it an "environmental pioneer" in the construction industry-90% of the materials can be reborn when demolished and turned into bridges, vehicles or new building components. Coupled with photovoltaic curtain walls, rainwater recycling systems and intelligent ventilation equipment, these steel forests have transformed into ecological organisms. A zero-carbon steel structure office building has even achieved zero annual carbon emissions, using technology to interpret the symbiosis between man and nature.
Product Advantages
1.Fast construction speed: Due to the high manufacturing precision of steel, components can be prefabricated in the factory, reducing on-site construction time. Moreover, the steel construction process is simple and efficient, reducing the risk of construction delays
2.Strong structural stability: Steel office buildings have strong structural stability and earthquake resistance. Steel is a building material with high strength and good rigidity and can withstand large loads, making office buildings better safe in natural disasters such as earthquakes
3.Low maintenance costs: Steel has a long service life and there are few problems requiring maintenance during use. In contrast, traditional concrete structures require regular inspection and maintenance, increasing the operating costs of the company
4.Good sustainability: Since steel can be recycled and reused, materials can be reused after construction is completed. This not only reduces the consumption of natural resources, but also benefits environmental protection. At the same time, the lightweight design of steel office buildings reduces land occupation and is conducive to the sustainable development of the city.
Product Attributes
Application | Warehouse/Workshop/ Hotel/Office/Supermarket/ Exhibition hall/ Showroom |
Construction Area | Based on requirements |
Size | Customized based on customer's requirements |
Main steel frame | Welded H steel with 2 layer of anti rust paint, hot dip galvanized and other paint is also available |
Wall cladding | Corrugated steel sheet+ Fiber glass wool insulation, Glass Curtain wall + Steel door |
Roof cladding | Corrugated sheet, EPS/Fiberglass wool/ Rock wool/ PU sandwich panel |
Door | Roller shutter door, Access door,Glass sliding door |
Ventilating | Roof ventilator |
Forming | Hot-Rolled Steel |
Type | H-Section Steel |
Connection Form | Bolt Connection |
After-sales Service | Installation Guidance& After-Sale Feedback |
Transport Specifications
Package Size | 100.00cm * 100.00cm * 100.00cm |
Package Gross Weight | 100.000kg |
Product Use
1.Office space: Steel structure office buildings can provide a spacious and bright office environment, suitable for use by enterprises and institutions of all sizes.
2.Commercial use: Steel office buildings can also be used for commercial activities, such as shopping malls, hotels, etc. Its flexible design can meet different commercial needs.
3.Technology companies: Technology companies represented by the Internet and software research and development have many team members and focus on collaboration and communication. The large-span open space of the steel structure office can create an open office area, allowing employees to communicate ideas and discuss projects at any time. For example, in some well-known Internet corporate parks, multiple steel-structure office buildings are *tered, and the spacious interior space is flexibly divided into multiple functional areas. Employees can freely shuttle between different project teams to promote the rapid flow of information and improve Innovation efficiency. Moreover, as the company's business expands, the flexible spatial layout can be easily adjusted to add new departments or R & D team areas.
Product Picture
Company Introduction
China CT Steel Structure Group Co., Ltd is a comprehensive
industrial group that integrates steel structure research and
development, design, manufacturing, production, and installation.
Since its establishment in 2004, it coversan area of approximately
300000 square meters and produces 200000 tons of steel structures
annually. We have over 500 well-trained employees, more than 100
professional design teams, after-sales service teams, and many
advanced equipment.
The company has 30 steel structure production lines, specializing
in the design, manufacturing, and installation of industrial and
civil buildings such as steel structure factories, warehouses,
high-rise steel structure buildings, office buildings,
exhibition,halls, sports halls, parking garages, prefabricated
houses, and agricultural projects. We are committed to providing
customers with innovative solutions that not only meet their
expectations, but also exceed them.
The quality control measures of steel structure project are as
follows:
1,Strengthen the management of technical personnel
In the construction process of the construction site, the
construction personnel occupy the main position in the steel
structure operation.In this case, it is necessary to carry out
specialized management for the participants of steel structure
projects.In the actual management of steel structure project
participants, it is found that the actual management work often
fails to achieve the expected effect.Firstly, due to the uneven
level of professional knowledge and comprehensive quality of the
construction personnel involved in steel structure construction,
they are not specialized steel structure construction
personnel.Secondly, there are many problems in the management of
steel structure construction personnel.The employees have loose
attitude and poor discipline, which is not easy to be managed in a
unified way.Facing this problem, the construction unit should
formulate a corresponding management system to restrain them, and
should not use conventional management methods.In addition, the
pre-service education and training of employees should be
strengthened to give full play to the enthusiasm of employees so
that they can naturally comply with the rules and regulations.
2, improve the construction control mechanism
In the process of engineering construction, more attention should
be paid to the construction of construction quality control
mechanism, to ensure the overall quality of engineering
construction by perfecting the construction mechanism.First of all,
the relevant units should improve the existing construction quality
management mechanism, combine the problems that may occur in
different construction links, and establish corresponding
management and processing mechanisms.Secondly, pay attention to the
construction supervision of steel structure.In the process of steel
structure construction, many different types of problems may be
encountered, and the corresponding processing mechanisms may be
different.In order to save the construction time and reduce the
construction difficulty, some construction personnel may adopt
unreasonable construction methods in the construction process, but
these methods cannot meet the construction requirements.Under the
supervision of the supervisory unit.All the work can be carried out
scientifically and reasonably, the probability of non-standard
construction problems is greatly reduced, and the overall quality
of the steel structure can be effectively guaranteed.The
construction party should establish a sound supervision and
management mechanism, encourage the relevant construction personnel
to supervise each other, cultivate their sense of crisis and
rigorous work attitude, and ensure the rationality of construction.
3,Strengthen construction material management
The quality of materials is directly related to the construction
quality and is an important content of construction quality
control.In the construction of steel structure project, the cost of
steel structure material is very high.Strengthening the
construction material management reduces the construction cost
while ensuring the subsequent steel structure construction
activities are carried out in an orderly manner.This requires
comprehensive consideration of construction needs and selection of
high quality and inexpensive materials.Specialists conduct in-depth
market research, compare and analyze the materials, lay the
foundation for more orderly implementation of subsequent steel
structure construction activities, and effectively improve the
construction quality of steel structure projects.
4,Strengthen the quality control of on-site steel structure
components
At the same time, the quality control of on-site steel structure
components should be strengthened.First of all, check the samples
provided by the permanent representatives and supervisors.If any
problem is found, the factory should be notified at one time for
correction and to ensure the quality of steel structure components
can be transported.On the other hand, the steel structural members
need to be inspected by the quality inspector of the supervisory
unit upon arrival at the site.
transport
FAQ
1. Are you manufacture factory or trading company?
We are manufacture factory, located in Qingdao city, near to
Qingdao port. And we have total 7 workshops from steel structure to
wall and roof sheet.
2. Can you provide free design?
Yes, we have 10 senior engineer with rich experience. You only need
to give me youridea, we will design for you with free.
3. Can you offer competitive prices?
If you have no special requirement for the material, we all use
materials from big material manufacture companies. We also can
design it according to your requirement. But no matter what kind of
quotation mode, offering the reasonable
price is our business objective.
4. How to install? Can you provide engineer to help?
We will provide the detail installations , like the CAD, 3D tekla,
etc. Or we will provide the engineers to help according to your
requirement.
5. Can I have a visit to your factory before the order?
Why not? Welcome to visit our factory. You can fly to Fujian
Quanzhou Airport, then we will pick you up at the airport, hotel
booking service is available.
6. ls your price competitive compared with other companies?
A:Our business objectives are to give the best price with same
quality and best quality with the same price. We will do everything
we can to reduce your cost and guarantee you get the best product
that you paid for.
7. Do you accept container loading inspection?
A:You are welcomed to send an inspector, not only for the container
loading, but any time during theproduction time.
8. Do you offer designing service for us?
A:Yes, we could design full solution drawings as your
requirements.By using Auto CAD,PKPM ,3D3S,Tekla Structures (X
steel) etc., we can design complex industrial building like office
mansion, super marker, auto dealer shop,shipping mall, 5 stars
hotel.
9.What is the delivery time?
A:Delivery time depends on order quantities.In general, the
delivery time to nearest seaport in China will be 30 days after
receiving deposit.
10.How can you get a quotation for your projects?
A:You can contact us by email, phone, TM, WhatsApp and so on 24*7
and you will get reply within 8 hours. Firstly, please send us your
project details and your requirements. Then we will design
accordingly, free of charge.Afterwards, please check and confirm
whether you like the drawings. If not, we shall get the drawings
revised until your confirmation.