

Add to Cart
701/41600 701/37300 Transmission Oil Pressure Switch 2CX 2DX LE 2CXL SS620 PS760 PS720 SS640 PS745
Product Description
Appliion | JCB 3C 3CX 3D 3DX 4C 4CX 1400B |
OEM NO. | 701/37300 |
MOQ: | 1PCS |
Warranty | Within 12 Months |
Type | Sensor |
Stock Status | In Stock |
Place of Origin | Guangzhou, China(Mainland) |
Applicable industry | Machinery Repair Shops, Construction Works |
Status | 100%NEW |
Service system | Field Installation, Commissioning And Training, Field Maintenance And Repair Service, Online Support, Engineers Available To Service Machinery Overseas, Free Spare Parts |
Product advantages
1. Using high-quality electronic components, the induction accuracy
is high.
2. The measurement range has high optical accuracy, and the
accuracy can reach 0.1%FS
3. Has good mechanical processing, heat treatment performance is
stable and reliable
4. It has strong compressive strength, little influence by
temperature, long service life and stable performance
5. High pressure protection, instant pressure 150KG to prevent oil
leakage
More related products you are looking for
701/60012 Switch locking type
JCB
701/45500 JCB
701/45500 Switch ignition
JCB
701/39600 Switch
JCB
701/52200 Switch rocker
JCB
701/40100 Switch
JCB
701/40400 Switch
JCB
701/60008 Switch 12V
JCB
701/60082 Switch Wiper
JCB
701/60001 JCB
701/60001 Switch 12V
JCB
332/Y6914 Switch Column Manual
JCB
701/57600 JCB
701/57600 Switch Thermostat
JCB
701/72500 Switch Red Top
JCB
FAQ
Q1. You are a trader or a manufacture?
A1.We are an industry and trade integration business, our factory
loed on Guangzhou, Guangdong, China
Q2. How can I be sure the part will fit my excavator?
A2.Give us correct model number/machine serial number/ any numbers
on the parts itself. or measure the parts give us dimension or
drawing.
Q3. How about the payment terms?
A3.We usually accept T/T or Trade Assurance. other terms also could
be negotiated.
Q4. What is your minimum order?
A4.It depends on what you are buying. Normally, Our minimum MOQ is
1PCS
Q5. What is your delivery time?
A5. Generally, it will take 1 to 3 days after receiving your
advance payment. The specific delivery time depends on the items
and the quantity of your order.
Q6. What about Quality Control?
A6.We have a perfect QC system for the perfect products. A team who
will detect the product quality and specifiion piece carefully,
monitoring every production process until packing is complete, to
ensure product safety into container.