Thick Phase Pneumatic Conveying Pump 2000m PLC Control

Brand Name:Hengcheng
Certification:ISO Patent Certificate High-Tech Product Certificate
Model Number:PCD24/H PCD26/H PCD28/H PCD30/H
Minimum Order Quantity:1 set
Delivery Time:60 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Hefei Anhui China
Address: No. 56, Dalian Road, Baohe District, Hefei City, Anhui Province,China
Supplier`s last login times: within 36 hours
Product Details Company Profile
Product Details

Pneumatic Conveying Pump 2000m Bin Pump Plc Control Thick Phase Conveying Equipment Bin Pump

Description

The design of pneumatic conveying system is the development process of a solution that utilizes airflow to transport powder, particles, or thin sheets through pipelines based on a set of operational requirements. The design of pneumatic conveying systems has many complexities and requires advanced professional technology. This complexity comes from various types of powder and particle materials, as well as significant changes in the operating conditions applicable to this conveying method. A validated method for developing solutions for pneumatic conveying system design. It is based on good industrial practices and our extensive experience from chemical engineering to food processing and pharmaceuticals.

Why is the design of pneumatic conveying systems so important?
An improperly designed pneumatic conveying system can lead to several major operational issues, seriously reducing its performance and maintainability. In addition, fault diagnosis and diagnosis of these issues may be difficult and may require a lot of time and effort. Many of these issues may affect the overall performance of the processing factory embedded in the system. This is because pneumatic conveying plays a central role in the processing plant. They are used to transfer bulk materials from one place to another for some form of processing. Any decrease in conveying performance will greatly affect the output of the processing plant.

Correcting problems during the operation of pneumatic conveying systems is often a complex process and costly. Remedial work usually requires detailed planning and skilled execution to minimize downtime in the processing plant.

There are several types of major operational issues that may arise from poor pneumatic conveying system design.

1. Accumulation and blockage: The accumulation and accumulation of powder or particulate matter can lead to blockage in the pneumatic conveying system. These sediments may lead to increased energy use or reduced transport capacity.

2. Restricting conveying capacity: Inappropriate pipeline layout and obstacles caused by poor integration of components within the pipeline can reduce the pneumatic conveying capacity. In addition, if excessive air velocity is used for conveying in the pipeline, it may reduce the pneumatic conveying capacity (this effect is not intuitive).

3. Elbow wear: For harder powder or granular materials, excessive conveying speed can increase the abrasive wear of the elbow and the sweeping along the pipeline. This may result in greater maintenance requirements and increased downtime, as these parts will require more frequent replacement.

4. Particle friction: The conveying speed of certain powder or granular materials is too fast, which can cause particles to break or crush into smaller particles. Fine particles are dust generated by these smaller particles moving at an excessively high speed and constantly breaking through contact with the rough internal surface of the conveying system. This may cause serious damage to the transportation of bulk materials and may seriously affect the output quality.


Large Capacity Pneumatic Conveying Bin Pump Parameter Table

Conveying MaterialBulk Density (t/m3)ModelPCD24/HPCD26/HPCD28/HPCD30/HConveying Distance
Specification16~20m318~22m320~27m326~32m3Level (m)Level (m)
Pulverized Coal0.5Delivery Volume (t/h)50~8060~9065~11080~13020020
Fly Ash0.7575~12585~13095~160125~19020020
Limestone Powder/Mineral Powder0.880~13090~140100~170130~20020020
Cement/Raw Meal1100~150115~175130~215165~26020020


Long-distance Pneumatic Conveying Bin Pump Parameter Table

Conveying MaterialBulk Density (t/m3)ModelPCD24/LPCD26/LPCD28/LPCD30/LConveying Distance
Specification16~20m318~22m320~27m326~32m3Level (m)Level (m)
Pulverized Coal0.5Delivery Volume (t/h)20~4025~4530~5545~65100025
Fly Ash0.7535~6045~6545~8065~95100025
Limestone Powder/Mineral Powder0.840~6545~7050~8570~100100025
Cement/Raw Meal150~8055~9065~11090~120100025

Conventional Grid Pneumatic Conveying Bin Pump Parameter Table

Conveying MaterialBulk Density(t/m3)ModelPCD18/NPCD20/NPCD20/NReference Conveying Distance
Specification5.0~6.7m37.0~10.0m310.0~15.0m3Level (m)Vertical (m)
Pulverized Coal0.5Delivery Volume (t/h)12~2016~3225~5050030
Fly Ash0.7518~3225~4835~7050
Limestone Powder/Mineral Powder0.820~3526~5138~7550030
Cement/Raw Meal1.024~4232~6548~9550030
Silicon Powder1.228~5040~7555~11550030

Parameter Table Of Small Size Pneumatic Conveying Bunker Pump

MaterialBulk Density(t/m3)ModelPCD08/MPCD10/MPCD12/MPCD14/MReference Conveying Distance
Specification0.2~0.5m30.6~1.6m31.5~2.5m32.5~5.0m3Level (m)Vertical (m)
Pulverized Coal0.5Delivery Volume (t/h)0.5~1.81.5~5.55.0~9.08.0~18.010020
Fly Ash0.750.9~2.82.5~8.57.0~14.012.0~27.010020
Limestone Powder/Mineral Powder0.81.0~3.03.0~9.08.0~15.012.0~28.010020
Cement/Raw Meal1.01.2~3.53.5~11.510.0~18.016.0~36.010020
Silicon Powder1.21.5~4.04.5~13.512.0~20.019.0~43.010020


Main features of the product

① Large conveying capacity: > 300t/h;

② Long distance: > 2000m;

③ Low power consumption: < 3.8kWh/t · km;

④ Low wear and tear: pipeline life>10 years;

⑤ Low speed: initial speed 6-10m/s;

⑥ High mixing ratio: > 30kg/kg;

⑦ Flexible process layout, dust-free, high operation rate, lower investment compared to mechanical conveying, and lower maintenance costs


Application Area

PCD pneumatic conveying equipment and systems have been widely used in industries such as building materials, chemicals, mining, power, and metallurgy. The conveying materials include cement, raw materials, fly ash, hydrated lime, dry discharged calcium carbide slag, slag powder, steel slag powder, coal powder, aluminum oxide powder, bauxite powder, phosphate powder, pyrophyllite powder, and organic silicon powder.


China Thick Phase Pneumatic Conveying Pump 2000m PLC Control supplier

Thick Phase Pneumatic Conveying Pump 2000m PLC Control

Inquiry Cart 0