

Add to Cart
High Speed Masking Tape Coating Machine Adhesive Tape Production Line
Features:
1. The oven adopts a high-efficiency centrifugal fan and is
equipped with an air flow rectification device, which makes the
drying uniformity of the surface coating of the substrate higher
and the drying efficiency higher.
2. The impregnation process is equipped with a high-efficiency
air-floating oven, which has high drying rate, uniform drying, good
product surface quality, convenient operation, maintenance and
cleaning. There is no idler in the oven, which reduces the
possibility of broken ends;
3. The tension is controlled in sections, using the frequency
conversion speed regulation system, the rewinding and unwinding are
controlled by vector frequency conversion, the rewinding can be set
with multi-taper tension, and the multi-point synchronous
controller is used to control the synchronous operation of the
whole machine;
4. Adopt EPC rectifier to ensure neat edges of finished products;
5. The impregnation coating process is equipped with a large
conditioning dryer to ensure the flatness and moisture uniformity
of the substrate;
6. The rewinding and unwinding are equipped with a film splicing
mechanism, which can realize non-stop paper splicing and high
production efficiency;
7. According to the different technological requirements of the
processed products, there are various types of coating heads to
choose from.
Technical Parameters:
Model Data | UW42-06 | UW42-11 | UW42-13 | UW42-16 |
Effective width (mm) | 600 | 1100 | 1300 | 1600 |
Mechnical speed(m/min) | 3~30 | 3~30 | 8~80 | 8~80 |
6~60 | 6~60 | 10~100 | 10~100 | |
10~100 | 10~100 | 15~150 | 15~150 | |
Oven length(m) | Depends on process | |||
Heating method | Steam /thermo-oil/hot wind stove/electricity |
Applications:
Mainly used for the production of the coating process of label paper, etc.
FAQ:
Q:Are you Trading Company orManufacturing Factory?
A: We are the leading manufacturer in Changzhou area for 10
years,our products have competitive price and
qualityguarantee.Welcome to send your inquiry!
Q: How about the Delivery time?
A: 10-15days after receiving the deposit based on the
MOQ.Normally,40-55 days to finish the order for a 20ft container.
Of course,we can also meet the urgent delivery time if the production schedule is not tight.Welcome to ask for the detailed deliverytime according to your order quantity!
Q: How can you guarantee the product quality?
A:We have the quality control system IS9001:2008,and it's been
followed strictly.We also have the professional QC team,and each
our package worker will be in charge of the final inspection
according to the QC instruction before packing.
Q: I'd like to know your Payment terms.
A: Basically, the payment terms are T/T,L/C at sight.Western
Union,Paypal,Moneygram Alipay,Credit card are
acceptable for sample order.
Q: Can you accept OEM?
A: Yes, we can accept OEM, manufacture according to your
requirements, without our logo and information, use your logo or
supplier neutral packaging
Q: How big is the power supply?
A: Usually we provide 380V/50HZ, we can also convert the power
supply to meet your local power supply, please contact us for
confirmation
Q: Can you provide quality certification?
A: Yes, we can provide the quality certificate issued by our
laboratory or the quality certificate issued by a third-party
international inspection agency for free, and charge an extra fee.
Q: Can you perform calibration and installation before the goods
are handed over?
A: Yes, we install, inspect and calibrate the goods before
packaging and handing them over. Customers can rest assured to
install and use.
Q: Beat Prices?
A:We are the manufacture and our president build this companyfrom
nothing.So we are the professional
and will do the best price.
Q:How can I know how my order is being done?
A:We will inspect and test all items in order to avoid damage and
missing parts before shipping.The detailed
inspection pictures of the order will be sent to you for your
confirmation before delivery.